Work Code: 1743002026/RC/22012034317999 (ग्राम डगावांशंकर में रेखा बाई के घर से शा.मा.शाला भवन की ओर 100 मीटर सी सी रोड सह नाली निर्माण)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 2/10/2016 Work start date : 15/12/2016
Present status : Earthern road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 026/408 Sanction Date : 6/12/2016
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost 14th Fianance Commission scheme2 scheme3 Total
89300 59400 0 0 232300 0 0 292000 0 381000
Financial Sanction Details
Financial\Administrative Sanction No: 026/18 Financial\Administrative Sanction Date 9/12/2016
Fin. Sanc. Amt. (in Rs) NREGA:148700 14th Fianance Commission
232300
Scheme 2
0
Scheme 3
0
Total
381000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Dag-beling-Double spade "v" shaped stroke 100mm deep3000.5150
2Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead6998.46789.6
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)303396.5101895
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)362498.689949.6
5Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1:2 (1cement, 1sand, 2graded stone aggregate 20 mm nominal size)113539.938938.9
6False work for R.C.C. and P.C.C. work in plinth and foundation186.67121.422661.738
7Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars408.1753.821959.546
8Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 30 Kms. and part there of upto 50 Kms.204.64354.2272487.5808
9Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work8914713083
10Collection of hard moorum including stacking at quarry.8914713083
Total Activity 381000
S.NoMaterialQuantityUnit PriceTotal
1Cement18830056400
2contengency131003100
3Convergence Amount1232300232300
Total Material 292000