S.No | Material | Quantity | Unit Price | Total |
1 | 3-Display Board | 1 | 3000 | 3000 |
2 | MR14001-Supply of insecticide chlorpyriphos . per pit | 5 | 230 | 1150 |
3 | MR14003-Supply of 38mm dia 1.50 mtr. Long bamboo sticks to support the plants to safe guard the tree from storm. | 100 | 35 | 3500 |
4 | MR14004-Supply of plants through contractor/nursery average rate for sapling above 6 feet height and 2.5 cm caliper size. | 100 | 100 | 10000 |
5 | MR14005-Tractor with tanker charges for watering the plants through tanker one tanker of 4000 ltrs. Water capacity is sufficient for 100 No plants. It will take 3 Hours. | 0.4 | 2034 | 813.6 |
6 | MR1712-Diesel | 78.75 | 66 | 5197.5 |
7 | MR1714-Depreciation charges of Tractor and centrifugal pump. | 25.2 | 28.29 | 712.908 |
8 | MR1716-Running repair cost | 25.2 | 56.58 | 1425.816 |
9 | MR1717-Suction pipe (125/Rmt - 50% Credit) | 192.024 | 0.5 | 96.012 |
10 | MR1718-Reflex valve (800/Each - 90% Credit) | 25.2 | 0.64 | 16.128 |
11 | MR1719-Nipplle (150/Each - 75% Credit) | 25.2 | 0.3 | 7.56 |
12 | MR1720-Safeda, Araldite and Clamp(50/Kit /Each - 75% Cerdit) | 25.2 | 0.1 | 2.52 |
13 | MR1721-Delivery Pipe | 384.3 | 0.39 | 149.877 |
14 | MR1722-Bend (550/Each - 75% Credit) | 25.2 | 1.1 | 27.72 |
15 | MR1791-Supplying of farm yard manure duly screened and stacked at site of work. | 12 | 159 | 1908 |
16 | MR1792-Loading /Unloading charges | 12 | 46.55 | 558.6 |
17 | MR1793-Carriage of manure 5 km lead | 12 | 171 | 2052 |