State: MADHYA PRADESH District: REWA Block: SIRMOUR Panchayat: BHATI GAWAN
Work Code: 1713/RC/22012034610294 (Periodic maintenance of CMGSY Road PMGSY Road Bhatigawan to Girgo)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2021-2022 Execution Level : ZP
Execution Agency : Rural Engineering Services(04004) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 15/9/2021 Work start date : 26/3/2022
Present status : Gravel Road Proposed Status : Repair & maint of Gravel Road Roads for Comm
Tech Sanction Details
Technical Sanction No. : 1713/13 Sanction Date : 13/1/2022
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost CMGSY scheme2 scheme3 Total
429000 186000 0 0 422000 0 0 608000 0 1037000
Financial Sanction Details
Financial\Administrative Sanction No: 1341/13 Financial\Administrative Sanction Date 2/3/2022
Fin. Sanc. Amt. (in Rs) NREGA:615000 CMGSY
422000
Scheme 2
0
Scheme 3
0
Total
1037000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Ordinary shrub jungle (areas below 25% covered by shrubs) clearance involving removal of grass. Shrubs, bushes and twigs, excluding uprooting (for survey works)70000.986860
2Work charge12200022000
3Surface dressing of ground, including removing vegetation, and/ or unequalities not exceeding 15cm deep and disposal of rubbish lead upto 50m And lift upto1.5m-Dense or hard soil35009.3232620
4Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.1470210.63309626.1
5Transportation rates for Hume pipes (NP-2) 250 mm to 300 mm dia.3039.861195.8
6Rolling & Compaction of granular sub-base of well graded material, spreading in uniform layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC, and compacting with smooth wheel rollers of 80 to 100 kN77062.7248294.4
7Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-300mm dia30435.9713079.1
8Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact70024.0616842
9Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:380958364040
10Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 With Reinforced cement concrete (i) 5th Kilometre Stone (precast) (ii) Ordinary Kilometer Stone (Precast) (iii) 200 m stone (precast)31617.64852.8
11Kilometre Stone Reinforced cement concrete M15 grade kilometre stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc as per drawing and Technical Specification Clause 1703 With Reinforced cement concrete ) With Local Stone (i) 5th Kilometre Stone (ii) Ordinary Kilometer Stone (iii) 200 m stone9491.834426.47
12Collection/Excavation of Gravel Material meeting the requirements of Hard moorum as detailed in RES SOR chapter No. 03 Notes Clause 3.2(C) including stacking and all leads and lifts up to the loading point at quarry.700211.55148085
13Collection of river Borne material (RBM)(any mixture of sand & gravel)i/c boxing and all leads and lifts up to the loading point at quarry.350185.3864883
Total Activity 1037000
S.NoMaterialQuantityUnit PriceTotal
11904 transportion rcc hump pipe3030.41912.3
2Hume pipe np2-300mm30415.9812479.4
3Semi Reflective Sign Board23075.86151.6
4sign semi providing C 800mm x 600 mm rectangular3387.4310162.2
5Transportanion of hard Muram1470153.24225262.8
6अन्‍य कर्य1353000353000
Total Material 608000