The Mahatma Gandhi National Rural Employment Guarantee Act 26-Sep-2024 11:28:40 PM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: DODWADA
Work Code: 1725006023/RC/22012034212808 (खेत सडक उप. आ. ग्रे. मार्ग नि. हेदरपुर पहुच मार्ग )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 26/1/2014 Work start date : 15/3/2014
Present status : Gravel Road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 2592 Sanction Date : 13/2/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
904000 547000 0 0 0 0 0 547000 0 1451000
Financial Sanction Details
Financial\Administrative Sanction No: 43 ?? Financial\Administrative Sanction Date 21/2/2014
Fin. Sanc. Amt. (in Rs) NREGA:1451000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1451000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.90004.136900
2Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead247.587.621681
3Chain and compass survey.-Headworks/Other Works05840
4Stacking without boxing.-Puddle earth, moorum, sand or kankar222010.523310
5Stacking without boxing.-Metal, single, stone chips or quarry spalls60025.615360
6Transportation rates for Masonry stone.000
7Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.600173.97104382
8Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.3024.35120.69365008.8015
9Labour only for spreading, hand packing, and levelling to gradient and required camber as per MOST 2004 clause 404.3.3 of metal grading-2 & 3 as per MOST 2004 clause 400.2.5 including dressing.22204191020
10Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-300mm dia50311.815590
11Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making1282.3524.931930.515
12Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor29872780649
13Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work4516.8597.7441296.245
14Earth work in rough excavation,filling excavated earth into depressions on banking as directed ,top surface to be levelled and neatly dressed.-Loose or soft soil360130.847088
15Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Hard moorum240114.327432
16Surface dressing of ground, including removing vegetation, and/ or unequalities not exceeding 15cm deep and disposal of rubbish lead upto 20m And lift upto1.5m-Dense or hard soil.60080.548300
17work charge1010001101000
Total Activity 1451000
S.NoMaterialQuantityUnit PriceTotal
1Construction of BGSY informati160006000
2contangency and work charges11700017000
3Kilometre Stone (200 M)43341336
4Kilometre Stone (ordinary)46872748
5km stone20601200
6PhotoCopy & Stationary120002000
7photographs2025500
8pipe5047523750
9roller 8 to 10358720.473174.8
10Transportation Of Earth Work302497.09293600.16
11Transportation of GSB600134.2180526
12WATER TENKAR8950044500
Total Material 547000