S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 7 | 145.4 | 1017.8 |
2 | Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete. | 7.5 | 454.3 | 3407.25 |
3 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 0.36 | 2478.2 | 892.152 |
4 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:4 (1cement, 4sand) | 5.74 | 3368.1 | 19332.894 |
5 | Add for masonry in supper structure above plinth level up to floor two level | 4.55 | 157.2 | 715.26 |
6 | Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height | 92.4 | 79 | 7299.6 |
7 | Steel work in built up tubular trusses including cutting, hoisting, fixing in position, welded and bolted including special shaped washers etc. complete of Mild steel tubes, electric resistant or induction butt welded | 50 | 53 | 2650 |
8 | 10mm thick cement plaster on fair side of wall in-Cement mortar 1:5 (1cement, 5sand) | 21.86 | 78.7 | 1720.382 |
9 | Providing corrugated C.I. sheet of class III roofing fixed with galvanised iron J or L hooks bolts and nuts 8mm diameter with bitumen and G.I. limpet washers or with complete excluding the cost of purlins, rafters and trusses.-0.63 mm thick sheet. | 10.8 | 542.5 | 5859 |
10 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Disintegrated or soft rock (not requiring blasting) for Well Work | 8.5 | 88.3 | 750.55 |
11 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.Dense or hard soil (PT/30/30) | 6.25 | 105 | 656.25 |
12 | work charge | 1 | 1200 | 1200 |