Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 06:07:30 PM 
Back  
State: MADHYA PRADESH District: REWA Block: SIRMOUR Panchayat: SADAHANA
Work Code: 1713003086/DP/22012034433202 (nirmal neer shridhar k ghar k pas kochri)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 29/8/2018 Work start date : 28/9/2018
Present status : Not Exist Proposed Status : Construction of Irrigation Open Well for Community
Tech Sanction Details
Technical Sanction No. : 1713003086/00003 Sanction Date : 29/9/2018
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
300000 235000 0 0 0 0 0 235000 0 535000
Financial Sanction Details
Financial\Administrative Sanction No: 1713003086/00003 Financial\Administrative Sanction Date 29/9/2018
Fin. Sanc. Amt. (in Rs) NREGA:535000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
535000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Setting out work Refferance pillers, refferancing bench mark and temporary bench mark Construction of Reference Bench Mark 50x50x70 cm. made of 1:3:6 cement concrete i/c excavation of 50x50x50 cm pit, working benchmark 30x30x45 cm at every 500 m interva215153225
2Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m9376.757137.75
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)42002.7711634
4Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1:2 (1cement, 1sand, 2graded stone aggregate 20 mm nominal size)000
5Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)575919.07109824.13
6Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars95691.265664
725mm thick marble tiles in risers and treads of steps, skirting dado walls and pillar laid on 10mm thick base of C.M. 1:3 and jointed with grey cement slurry including rubbing polishing etc. complete.13200032000
8Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil25075.3618840
9Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)852199.29169795.08
10Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.815142.4116056
Total Activity 535000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL18000236000
2Blasting400156000
3Bricks120002000
4Cement25030075000
5Centering and Shuttering170007000
6Display board125002500
7SAND22200044000
8sariya150005000
9STEEL35001552500
10transportion150005000
Total Material 235000