S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Cutting down trees (exceeding 30cm girth, grubbing uproot, filling pits and levelling off ground, lopping branches, trimming, removing not exceeding 50meter & staking serviceable material and cleaning site.-Girth exceeding 30 cm and not exceeding 100 cm | 24 | 3467.99 | 83231.76 |
2 | Cement Lime Mortar 1:1:6 ( 1 cement, 1 lime putty, 6 sand ) | 64 | 191.2 | 12236.8 |
3 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 36 | 272.57 | 9812.52 |
4 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 32.8 | 4408.25 | 144590.6 |
5 | contingency | 4000 | 1 | 4000 |