State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: DHOWAT(P)
Work Code: 1703004037/RC/22012034338884 (SUDUR SAMPARK SADAK NIRMAN DHOWAT SE MASUDPUR KI OR DHOWAT )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2017-2018 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2017 Work start date : 22/5/2017
Present status : No Road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 37/128 Sanction Date : 6/5/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
391445 407555 0 0 0 0 0 408000 0 799000
Financial Sanction Details
Financial\Administrative Sanction No: 37/02 Financial\Administrative Sanction Date 8/5/2017
Fin. Sanc. Amt. (in Rs) NREGA:799000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
799000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead110001000
2Double levelling for transfer of bench marks.-Upto15 m interval0.730712149.7
3Transportation of metal 2020.3872.36146194.6968
4Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-300mm dia151535.523032.5
5Construction of granular sub-base (GSB) by naturally occurred material or river born material or by crushed metal or mixture of two or more, to bring the material in appropriate grading mentioned in table 400.1, (I, II or III) of specifications for rural367.5576.9212010.75
6Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact2902.3838.4111451.392
7Construction of hard shoulder as per clause 407 of specifications for rural roads (MORD), with soil having CBR value not less than 12, inclusive of all leads and lifts, providing 4-5% camber by tractor mounted grader or labourers, watering at OMC and comp224268.460121.6
8Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:105504.853004
9Site clearance, cutting grass, raking into heaps and removing off the premises49001.88820
10SIGN BOARD15933.85933.8
11Lossening of hard soil by ploughing the existing gound2902.382.77836.426
12Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed2902.3850145119
13contingency12005420054
142507. KM Stone (A) With Rainforced CC (ii) Ordinary KM Stone211352270
152507. KM Stone (A) With Rainforced CC (ii) 200 M Stone300
Total Activity 799000
S.NoMaterialQuantityUnit PriceTotal
1BGSY Information Board in Ceme15938.85938.8
2Compaction of GSB367.5306.77112737.975
3construcation of hard shoulder105277.9729186.85
4contangency and work charges120282.1620282.16
5earthen soil 2043 Compaction 2902.3838.4111451.392
6Hard Moorum Transportation2020.3829.4359459.7834
7hard shoulder transportion224130.7729292.48
8hume pipe151535.523032.5
9Kilometre Stone (200 M)33341002
10Kilometre Stone (ordinary)211352270
11Loosening Machine Rent2020.382.75455.026
12setting out wotrk0.77462.95224.03
13signs semi providing 800mm x 6122222222
Total Material 408000