Work Code: 1713006008/RC/22012034324636 (sudoor gram sampark sadak balendra shekhar mishra gram malaiganwa se ramesh panday gram bhago pahuch)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : Yes
Proposal Date : 2/10/2016 Work start date : 28/1/2017
Present status : No Road Proposed Status : Construction of Gravel Road Roads for Community
Tech Sanction Details
Technical Sanction No. : 561/6008 Sanction Date : 27/1/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
464000 986000 0 0 0 0 0 986000 0 1450000
Financial Sanction Details
Financial\Administrative Sanction No: 14/6008 Financial\Administrative Sanction Date 28/1/2017
Fin. Sanc. Amt. (in Rs) NREGA:1450000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1450000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard115001500
2Survey & Investigation11647116471
3Setting out work Refferance pillers, refferancing bench mark and temporary bench mark Construction of Reference Bench Mark 50x50x70 cm. made of 1:3:6 cement concrete i/c excavation of 50x50x50 cm pit, working benchmark 30x30x45 cm at every 500 m interva11088310883
4Site clearance, cutting grass, raking into heaps and removing off the premises10000330000
5Earth work in excavation in trenches for foundations and for pipes, cables etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including getti-Dense or hard soil40.46127.75166.742
6Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)61927.511565
7Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2.5:5 (1cement, 2.5 sand, 5metal)38.122282.787016.524
8Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)2591.50.16414.64
9False work for R.C.C. and P.C.C. work in plinth and foundation134.56155.320897.168
10Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars2051.71034
11Transportation of metal 4288.0399.27425672.7381
12Transportation of metal 325139.5945366.75
13Providing and filling in foundation trenches and at the back of abutments, wing walls etc. and below pipe bed in layers not exceeding 15cm thick including watering and compacting including all lead and lifts.-Selected granular material in filling.32.8584.619174.88
14Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-1000 mm dia.123853.246238.4
15Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making135018.424840
16Compaction of soil for construction of subgrade & earthen shoulders with approved transported material collected and stacked at site, i/c spreading, making 4% camber and required gradient by tractor mounted grader or labourers, watering at OMC and compact2576.5124.763639.797
17Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7)33035.911847
18Construction of gravel base course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more to bring the material in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clau525576.9302872.5
19Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:140508.671204
20Lossening of hard soil by ploughing the existing gound4651.112.712557.997
21Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed4820.5150241025.5
Total Activity 1450000
S.NoMaterialQuantityUnit PriceTotal
1BAJARA8060048000
2Compaction of Selected soil80106.38504
3compaction of sub grad earthen2976.5124.773519.797
4Display board115001500
5Gravel or moorum534526.9281364.6
6hume pipe123853.246238.4
7loosing and compexion30002.78100
8roler14053074200
9Transportanion of hard Muram220530116600
10Transportanion of Soft Muram330430141900
11Transportation Of Earth Work580320185600
Total Material 986000