Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 05:46:43 PM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: PANDHANA Panchayat: DIWAL
Work Code: 1725007024/WC/22012034683111 (CTR जलसंवर्धन कार्य राजेंद्रसिंह सुमेरसिंह के खेत पास )
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2021-2022 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2021 Work start date : 27/4/2021
Present status : Non-existent Proposed Status : Constr of Water Absorption Trench Trench for Comm
Tech Sanction Details
Technical Sanction No. : 1725007/2021-2022/216625/TS Sanction Date : 8/5/2021
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
415597.37 283593.33 76.07 284.89 0 0 0 284000 0 699551.66
Financial Sanction Details
Financial\Administrative Sanction No: 1725007/2021-2022/216625/AS Financial\Administrative Sanction Date 8/5/2021
Fin. Sanc. Amt. (in Rs) NREGA:699837 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
700000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1(V) 2.5 Km. Lead2800118.863385714286332817.48
2Site clearance, cutting grass, raking into heaps and removing off the premises80002.666912521335.3
3b (iii) Dense or hard soil for Tank Work300136.30626666666740891.88
4Loosing of hard soIl such as moorum etc. By ploughing (tractor ect.) the existing ground exceeding 30cm in depth as well as 10 sqm on plan including all running expanses of machine.38403.600179687513824.69
5Spreading dressing, breaking of clods of ploughed earth upto 20m lead and lift upto 1.5m disposed soil to be leveled and neatly dressed.384074.8321302083333287355.38
6Citizen Information Board Size 0.9 Meter x 1.2 Meter ( Community Works )13613.853613.85
Total Activity 700000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper0.018858.85
20084-Hire charges of Diesel truck - 9 tonne (without POL)81.26412242182194.1122
30367-Portland Cement0.02895511159.2679
40368-White cement 0.0004157446.2976
50983-Fine sand (zone IV)0.0471076.2550.58375
61235-Diesel oil601.35446840892.0992
75001-Mobil oil21.1287182.93864.43923
87900-Modular common burnt clay bricks of class designation 7.5244.44.131009.372
9MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT0.06552534.125
10MR6032-Snowcem/ durocem0.00072778919.4523
11MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)0.02468216.368
12MR6089-Hire Charges for tractor with ploughing arrangement including running expanses and driver17.2870812234.24
Total Material 241000