State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: TINDUWA
Work Code: 1711003/WC/22012035087122 (Const. of Stopdam Tinduwa Nala per Tinduwa)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2023-2024 Execution Level : BP
Execution Agency : Rural Engineering Services(04004) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : No
Proposal Date : 14/4/2023 Work start date : 22/6/2023
Present status : Non-existent Proposed Status : Constr of Masonry/CC Anicut for Community
Tech Sanction Details
Technical Sanction No. : 283/23 Sanction Date : 18/5/2023
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
1155000 2144000 0 0 0 0 0 2144000 0 3299000
Financial Sanction Details
Financial\Administrative Sanction No: 2107/23 Financial\Administrative Sanction Date 12/6/2023
Fin. Sanc. Amt. (in Rs) NREGA:3299000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
3299000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard136823682
2Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Disintegrated or soft rock (not requiring blasting)31.33335.8710522.8071
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)455.23855.971755237.544
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)30.083202.6396335.1104
5Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1:2 (1cement, 1sand, 2graded stone aggregate 20 mm nominal size)186729.58121132.44
6False work for R.C.C. and P.C.C. work in plinth and foundation464.3174.2180885.703
7Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height45087.1739226.5
8Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars2918.2269.58203049.7476
922cm thick dry stone picked up boulder pitching i/c picking of boulder with individual size of 22cm depth.200215.9443188
10Transportation of metal 452.04414.75187483.59
11Transportation of sand226.11784.8177451.128
12Transportation rates for Masonry stone.1851.54213.91396062.9214
13Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil1173.54156.79183999.3366
Total Activity 3299000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL167.41050175770
240 M.M. METAL188.76950179322
3CEMENT (BEGS)2547340865980
4Contangancy14500045000
5False Work416138.5157620.16
6mooram198.75406.7180833.6125
7SAND (RATE)173.322250389970
8sign board136823682
9steel345102.735431.5
10steel work76579.2760641.55
11Transporation of Sand173.32585.71101515.2572
12Transportation of metal356.16414.75147717.36
Total Material 2144000