State: MADHYA PRADESH District: HARDA Block: HARDA Panchayat: ABGAON KHURD
Work Code: 1743002004/RC/22012034292236 (आंतरिक पथ निर्माण ग्राम अबगांवखुर्द में नारायण चोयल के खेत से कैलाश पटेल के खेत की ओर 750 मीटर)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/4/2015 Work start date : 9/12/2015
Present status : Earthern road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 04/351 Sanction Date : 30/11/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
886000 556000 0 0 0 0 0 556000 0 1442000
Financial Sanction Details
Financial\Administrative Sanction No: 04/113 Financial\Administrative Sanction Date 9/12/2015
Fin. Sanc. Amt. (in Rs) NREGA:1442000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1442000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises75001.813500
2Dag-beling-Double spade "v" shaped stroke 100mm deep22500.51125
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)3.3752498.68432.775
4Transportation of metal 3051129.51395135.01
5Transportation of metal 371.25148.4155097.2125
6Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 30 Kms. and part there of upto 50 Kms.15768.0411520.6
7Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.73422.2546157423.5
8Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-1000 mm dia.154341.665124
9Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making378031.6119448
10Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor371.2533.512436.875
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work113491.2103420.8
12Collection of soft moorum including stacking at quarry.3051126.7386561.7
13Collection of hard moorum including stacking at quarry.371.2514754573.75
14contingency15794257942
Total Activity 1442000
S.NoMaterialQuantityUnit PriceTotal
11904 tranportion of rcc hum pi15768.0411520.6
240 mm Metal3.0322006666
3Cement153154725
4compaction of sub grad earthen371.2519.647291.35
5contigency15126351263
6hume pipe154949.474241
7Rolling Earth & moorum378025.2895558.4
8Transportanion of hard Muram371.25104.1338658.2625
9Transportanion of Soft Muram305185.23260036.73
10बोर्ड130003000
11रेत1.5220003040
Total Material 556000