S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Contingency | 1 | 7000 | 7000 |
3 | Work charge | 1 | 15933 | 15933 |
4 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 188.2 | 21.9 | 4121.58 |
5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 239.2 | 35.8 | 8563.36 |
6 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 2.82 | 3813.2 | 10753.224 |
7 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 1.87 | 2404.1 | 4495.667 |
8 | Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1:2 (1cement, 1sand, 2graded stone aggregate 20 mm nominal size) | 36.25 | 4158.1 | 150731.125 |
9 | False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift | 409.77 | 223.8 | 91706.526 |
10 | Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Lime mortar 1:2 (1lime putty, 2sand) | 22.76 | 2513 | 57195.88 |
11 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars | 472.95 | 54.4 | 25728.48 |
12 | TRANSPORTATION OF MATERIAL | 1 | 38448 | 38448 |
13 | Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 95.37 | 119.7 | 11415.789 |
14 | Earth work for well excavationSoil Lift from 1.5 m. to 2.00 m. | 19.33 | 126.8 | 2451.044 |
15 | Earth work for well excavation-Soil lift from 2.00 m. to 2.50 m. | 19.23 | 133.9 | 2574.897 |
16 | Earth work for well excavation-soil lift from 2.50 m. to 3.00 m. | 19.23 | 141 | 2711.43 |
17 | Earth work for well excavation-Soil lift from 12.50 m. to 13.00 m. | 7.94 | 327.2 | 2597.968 |
18 | Earth work for well excavation-Hard moorum lift from 3.00 m. to 3.50 m. | 16.58 | 148.1 | 2455.498 |
19 | Earth work for well excavation-Hard moorum lift from 5.50 m. to 6.00 m. | 15.33 | 88.32 | 1353.9456 |
20 | Earth work for well excavation-Hard moorum lift from 3.50 m. to 4.00 m. | 16.58 | 155.2 | 2573.216 |
21 | Earth work for well excavation-Hard moorum lift from 4.00 m. to 4.50 m. | 16.58 | 162.3 | 2690.934 |
22 | Earth work for well excavation-Hard moorum lift from 4.50 m. to 5.00 m. | 16.58 | 169.4 | 2808.652 |
23 | Earth work for well excavation-Hard moorum lift from 5.00 m. to 5.50 m. | 15.33 | 88.32 | 1353.9456 |
24 | Earth work for well excavation-Hard moorum lift from 6.00 m. to 6.50 m. | 15.33 | 183.6 | 2814.588 |
25 | Earth work for well excavation-Hard moorum lift from 6.50 m. to 7.00 m. | 15.33 | 193 | 2958.69 |
26 | Earth work for well excavation-Hard moorum lift from 7.00 m. to 7.50 m. | 15.33 | 202.4 | 3102.792 |
27 | Earth work for well excavation-Hard moorum lift from 7.50 m. to 8.00 m. | 14.31 | 211.8 | 3030.858 |
28 | Earth work for well excavation-Hard moorum lift from 8.00 m. to 8.50 m. | 11.87 | 230.6 | 2737.222 |
29 | Earth work for well excavation-Hard moorum lift from 10.50 m. to 11.00 m. | 9.81 | 280 | 2746.8 |
30 | Earth work for well excavation-Hard moorum lift from 8.50 m. to 9.00 m. | 11.87 | 240 | 2848.8 |
31 | Earth work for well excavation-Hard moorum lift from 9.00 m. to 9.50 m. | 11.87 | 249.4 | 2960.378 |
32 | Earth work for well excavation-Hard moorum lift from 9.50 m. to 10.00 m. | 11.87 | 258.8 | 3071.956 |
33 | Earth work for well excavation-Hard moorum lift from 10.00 m. to 10.50 m. | 9.81 | 268.2 | 2631.042 |
34 | Earth work for well excavation-Hard moorum lift from 11.00 m. to 11.50 m. | 8.85 | 291.8 | 2582.43 |
35 | Earth work for well excavation-Hard moorum lift from 11.50 m. to 12.00 m. | 8.85 | 303.6 | 2686.86 |
36 | Earth work for well excavation-Hard moorum lift from 12.00 m. to 12.50 m. | 7.94 | 315.4 | 2504.276 |
37 | Earth work for well excavation-Hard moorum lift from 13.00 m. to 13.50 m. | 7.94 | 339 | 2691.66 |
38 | Earth work for well excavation-Hard moorum lift from 13.50 m. to 14.00 m. | 7.94 | 350.8 | 2785.352 |
39 | Earth work for well excavation-Hard moorum lift from 14.00 m. to 14.50 m. | 7.94 | 362.6 | 2879.044 |
40 | Earth work for well excavation-Hard moorum lift from 14.50 m. to 15.00 m. | 7.94 | 374.4 | 2972.736 |