Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Sep-2024 11:13:13 PM 
Back  
State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: PURWA U.310
Work Code: 1713004072/RC/22012034324348 (Ts1683 sudoor gram sampark sadak nirman rajendra dwevedi ke ghar se uttar ki taraf gram purva 310,10)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2016-2017 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 2/10/2016 Work start date : 22/1/2017
Present status : No Road Proposed Status : Gravel Road
Tech Sanction Details
Technical Sanction No. : 1683/72/ Sanction Date : 19/1/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
403000 697000 0 0 0 0 0 697000 0 1100000
Financial Sanction Details
Financial\Administrative Sanction No: 14/72/ Financial\Administrative Sanction Date 20/1/2017
Fin. Sanc. Amt. (in Rs) NREGA:1100000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1100000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard015000
2Site clearance, cutting grass, raking into heaps and removing off the premises10241.71740.8
3Dag-beling-Single spade stroke minimum 75mm deep4800.3144
4Transportation of metal 1513.148112.41170092.96668
5Transportation of metal 1513.148412.02623447.23896
6Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-600mm dia4964.43857.6
7Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making294.1721.66354.072
8Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor292.52236727.96
9Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work73.54287.36420.2166
10Collection of puddle earth including stacking at quarry1013.148123.3124921.1484
11Collection of hard moorum including stacking at quarry.974.16140.7137064.312
12SIGN BOARD129342934
13Labour difference in case of old SoR10015915900
Total Activity 1100000
S.NoMaterialQuantityUnit PriceTotal
1Compaction of Earth Work294.1716.94971.473
2Compaction of GSB14500045000
3contigency12500025000
4GITTI11500015000
5Gravel or moorum14500045000
6hume pipe12150018000
7Rolling Earth & moorum15500055000
8Roolig15500055000
9Soil transport12500025000
10Transportanion of hard Muram1125000125000
11Transportation charges15400054000
12Transportation Of Selected Soi1205000205000
13बोर्ड12500025000
Total Material 697000