S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Cement concrete 1:2:4 with stone ballast or shingle | 1.065 | 4888.74178403756 | 5206.51 |
2 | Cement Concrete 1:8:16 with 40 mm Gauge stone aggregate | 1.349 | 3230.58561897702 | 4358.06 |
3 | Planting permanent shrubs including digging of pits on earth size 0.60mmx0.60mmx0.60mm deep, refilling the excavated earth mixed with manure supplied @ 0.056 cum each and watering Supply through the tractor
tanker | 50 | 161.9272 | 8096.36 |
4 | Earth work excavation in tank/digging work (Tank, Bandh, Pond/New Nalah, New Water Channel and construction of Retaining structure work).(1.1)Earth work excavation in Pond (Dugout, Pond, Mini Percolation Tank, compost Pit etc.) Ring Bandh (percolation Embankment, Earthen Gully plug, Water Harvesting Structure, Silt Distention Dam etc.)/pond/New Nalha/New Channal etc. Retuning wall-( wet or dry soil), laying 15 cm. layer-breaking of clods and emoving of Kankar and grass roots, dressing of earth work including compaction {with durmut) complete in all respect. (a) Ordinary Soil (iv) 1.5meter vertical lift and 100meter horizontal lead. | 492.75 | 318.539238964992 | 156960.21 |