State: MADHYA PRADESH District: DHAR Block: NALCHHA Panchayat: Banjaripura
Work Code: 1722005/WC/22012034680044 (CTRA STOP DAM KAWADHI WALA NALA NO. 1)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2021-2022 Execution Level : BP
Execution Agency : Rural Engineering Services(04004) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/4/2021 Work start date : 27/4/2021
Present status : Non-existent Proposed Status : Constr of Masonry/CC Anicut for Community
Tech Sanction Details
Technical Sanction No. : 1079(20-21) Sanction Date : 4/4/2021
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
430000 2061000 0 0 0 0 0 2061000 0 2491000
Financial Sanction Details
Financial\Administrative Sanction No: 1866 Financial\Administrative Sanction Date 22/4/2021
Fin. Sanc. Amt. (in Rs) NREGA:2491000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
2491000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard140004000
2Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)357.73816.221365061.894
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)92.093162.89291270.5401
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal)70.572822.4199176.768
5Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1.5:3 (1cement, 1.5sand, 3graded stone aggregate 20 mm nominal size)29.125758.79167695.9648
6False work for R.C.C. and P.C.C. work in plinth and foundation383.09160.5361497.4377
7Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height50074.237100
8Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars1150.1872.0182824.4618
9Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil221.99593.75131806.5625
10Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Hard moorum98.6178.7417623.764
11Excavation in trenches for foundations and for pipes, cables, etc. not exceeding 1.5m in width and for shafts, cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms, lift upto 1.5m including getting out and-Disintegrated or soft rock (not requiring blasting)172.66568.9598234.907
12FTSC- Field supervision charges13400034000
Total Activity 2491000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL.380900342000
240 M.M. METAL8070056000
3Blasting Holas50013065000
4CEMENT (BEGS)30003751125000
5Centring & Shuttering30012036000
6Contangancy12500025000
7Gate Plate and Angle000
8IRON GATE 25008542500
9Mason (semi skilled)000
10Mixer Machine000
11Sand2301300299000
12steel12005060000
13Water Transportation2050010000