Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Sep-2024 11:18:15 PM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: RICHHARIKALAN(P)
Work Code: 1703004083/RS/22012034291430 (Pooran Kusbaha ke duar se malgadha richharikala)
Work Category: Rural Sanitation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/8/2015 Work start date : 13/11/2015
Present status : Not Exist Proposed Status : Drainage Channel
Tech Sanction Details
Technical Sanction No. : 784 Sanction Date : 4/9/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
398095 344341 0 0 0 0 0 345000 0 742436
Financial Sanction Details
Financial\Administrative Sanction No: 083/114 Financial\Administrative Sanction Date 2/10/2015
Fin. Sanc. Amt. (in Rs) NREGA:742436 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
743000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Contingency120076.9920076.99
2Dag-beling-Single spade stroke minimum 75mm deep6000.3180
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal)42209888116
4Providing and laying damp proof course 50mm thick with C.C.1:2:4 with 20mm size graded stone aggregate. including curing.240194.646704
5Random / uncoursed rubble masonry in plinth and foundation including levelling up with cement concrete 1:6:12 (1cement, 6coarse sand, 12 aggregate 20mm nominal size) at plinth level.-In Cement mortar 1:8 (1cement, 8sand)202.51721.5348603.75
6Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Ruled pointing60073.944340
7Transportation of 20 MM metal48.84433.121152.604
8Transportation rates for Masonry stone.202.5537.785108901.4625
9Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.113.1994172.0319473.692782
10Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil95472.544887.5
Total Activity 743000
S.NoMaterialQuantityUnit PriceTotal
120mm metal10.2135013770
240 MM Metal supply38.64499.419296.816
3Cement477260124020
4Khanda Praday192.38585.69112675.0422
5PhotoCopy & Stationary12342.8922342.892
6SANT96.31575072236.25
Total Material 345000