Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Sep-2024 01:52:10 AM 
Back  
State: MANIPUR District: CHURACHANDPUR Block: Tuiboung Panchayat: Hmar veng
Work Code: 2003009023/FP/31646 (Const. of protection wall along Bijang stream at Hmar Veng)
Work Category: Other Works
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat (3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 6/6/2018 Work start date : 6/7/2018
Present status : Weak Embankment Proposed Status : Repair & maint of intrmediate & Lnk Drain for Comm
Tech Sanction Details
Technical Sanction No. : MGNREGS/7/W(2)/2018-19 (0187) Sanction Date : 15/6/2018
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
1043119 368881 0 0 0 0 0 369000 0 1412000
Financial Sanction Details
Financial\Administrative Sanction No: MGNREGS/7/W(2)/2018-19 (0187) Financial\Administrative Sanction Date 15/6/2018
Fin. Sanc. Amt. (in Rs) NREGA:1412000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1412000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Carriage charge of materials by head loads ...356000210000
2Earthwork in excavation in foundation trenches or drains including dressing of sides and ramming of bottom lift upto 1.5m including getting out the excavated soil and disposal of surplus soil as directed within a lead of 50 m. (b) Hard dense soil28621736
3Felling of tree girth measured at a height of 1m above ground level ic cutting of trunks and branches ramming roots and stacking of serviceable materials and disposal of unservicable materials. (1.2.2) beyond 60 cm and upto 120 cm in girth.3054016200
4Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 300cm measured at a height of 1 metre above ground level and removal of rubbish upto a distance of 50 m, outside the periphery of the area cleared.150005000
5Polygonal ruble masonry/ R.R masonry ( uncoursed/ brought to courses) squared rubble masonry (uncoursed / brought to courses) with hard stone of approved quality in foundation and plinth in cement mortar 1:3 ( 1 cement : 3 coarse sand ) i/c leveling up with cement concrete 1:6:12 at plinth level.1504898734700
6Filling available excavated earth(e/c rock) in trenches plinth sides of foundation etc. in layers not exceeding 20 cm in depth consolidating each deposited layer by ramming, watering lead upto 50 m and lift upto 1.5 m234009200
7P/L cement concrete in foundation and plinth excluding the cost of centering and shuttering in i) 1:5:10 (1 cement : 5 course sand : 4 graded stone aggrt. 40 mm nominal size)365120184320
8P/L cement concrete in foundation and plinth excluding the cost of centering and shuttering in ii) 1:2:4 (1 cement : 2 course sand : 4 graded stone aggrt. 20 mm nominal size)184788478
9P/L cement concrete in foundation and plinth excluding the cost of centering and shuttering in i) 1:5:10 (1 cement : 5 course sand : 10 graded stone aggrt. 40 mm nominal size)177198122366
1015 mm cement plaster 1:3 (1 cement : 3 course sand) finished with a floating coat of neat cement403000120000
Total Activity 1412000
S.NoMaterialQuantityUnit PriceTotal
1Cement3054016200
2Display board150005000
3Mates remuneration234009200
4Misc.184818481
5Stone Single403000120000
6Transportation and handling co356000210000
Total Material 369000