Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Sep-2024 12:16:21 AM 
Back  
State: MADHYA PRADESH District: KATNI Block: DHIMERKHEDA Panchayat: PADRBHATA
Work Code: 1744006059/LD/3799431844 (शांतिधाम निर्माण कार्य बडखेरा)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 30/1/2014 Work start date : 28/2/2014
Present status : Not Exist Proposed Status : Development of Waste Land
Tech Sanction Details
Technical Sanction No. : 13197 Sanction Date : 15/2/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
373000 400000 0 0 0 0 0 400000 0 773000
Financial Sanction Details
Financial\Administrative Sanction No: 140/59 Financial\Administrative Sanction Date 17/2/2014
Fin. Sanc. Amt. (in Rs) NREGA:773000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
773000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises100001.515000
2Contingency180008000
3Pumping out water caused by springs tidal or river seepage, broken water mains or drains or well point pumping and the like.83.0448.34010.832
4Labour only for item no.0402207.732.46729.48
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal)11.51985.722835.55
6Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)21.933113.968287.827
7False work for R.C.C. and P.C.C. work in plinth and foundation307.1132.340629.33
8Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand)23.73217551612.75
9Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height1305.663.983427.84
10Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars1174.8654.864382.328
11Providing corrugated C.I. sheet of class III roofing fixed with galvanised iron J or L hooks bolts and nuts 8mm diameter with bitumen and G.I. limpet washers or with complete excluding the cost of purlins, rafters and trusses.-0.63 mm thick sheet.45635.228584
12Labour only for item no. 11014525.61152
13Providing ridges or hips 600mm over all in plain G.I. sheet class III fixed with galvanised iron J or L hooks bolts and nuts 8mm diameter G.I. limpet bitumen washers complete.-0.63 mm thick sheet.12331.83981.6
14Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.13.574.81009.8
15Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point.9102918
16Transportation of metal 21.57163.643529.7148
17Transportation of 20 MM metal19.05414.367893.558
18Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms.9156.361407.24
19Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms.3.27268.47877.8969
20Transportation of sand41.78208.88723.664
21Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.23.73165.283922.0944
22Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.9128.071152.63
23Transportation rates for Col, fuel wood, iron work, steel G.I sheets paints, oils, pipes and machinery etc1.175268.47315.45225
24Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil83.08132.3810998.1304
25Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum55.36214.1611855.8976
26Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)69.2501.2134683.732
27Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work3459.5273.4253928.768
28Surface dressing of ground, including removing vegetation, and/ or unequalities not exceeding 15cm deep and disposal of rubbish lead upto 20m And lift upto1.5m-Dense or hard soil.12006.37560
29Collection of hard moorum including stacking at quarry.180118.321294
30Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point.4.5137.6619.2
31SIGN BOARD125002500
32Sewage connection6166.66999.96
Total Activity 773000
S.NoMaterialQuantityUnit PriceTotal
11101(a)- C.I Sheet .63 mm thic45635.228584
220 M.M. METAL19.05120022860
340 M.M. METAL8.07749.146045.5598
4904-STEEL PLACING WORK1174.8650.859682.888
5Bricks118653.0536188.25
6Cement34028095200
7Centering and Shuttering307.180.924844.39
8Display board125002500
9IRON SARIYA000
10Mixer1290010800
11Moorum13314933149
12Pani pariwahan58004000
13Sand41.7860025068
14steel work786.8263.950277.798
Total Material 400000