S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 10000 | 1.5 | 15000 |
2 | Contingency | 1 | 8000 | 8000 |
3 | Pumping out water caused by springs tidal or river seepage, broken water mains or drains or well point pumping and the like. | 83.04 | 48.3 | 4010.832 |
4 | Labour only for item no.0402 | 207.7 | 32.4 | 6729.48 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal) | 11.5 | 1985.7 | 22835.55 |
6 | Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size) | 21.93 | 3113.9 | 68287.827 |
7 | False work for R.C.C. and P.C.C. work in plinth and foundation | 307.1 | 132.3 | 40629.33 |
8 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand) | 23.73 | 2175 | 51612.75 |
9 | Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height | 1305.6 | 63.9 | 83427.84 |
10 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Cold twisted / Hot rolled deformed / Thermo mechanicaly treated steel bars | 1174.86 | 54.8 | 64382.328 |
11 | Providing corrugated C.I. sheet of class III roofing fixed with galvanised iron J or L hooks bolts and nuts 8mm diameter with bitumen and G.I. limpet washers or with complete excluding the cost of purlins, rafters and trusses.-0.63 mm thick sheet. | 45 | 635.2 | 28584 |
12 | Labour only for item no. 1101 | 45 | 25.6 | 1152 |
13 | Providing ridges or hips 600mm over all in plain G.I. sheet class III fixed with galvanised iron J or L hooks bolts and nuts 8mm diameter G.I. limpet bitumen washers complete.-0.63 mm thick sheet. | 12 | 331.8 | 3981.6 |
14 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 13.5 | 74.8 | 1009.8 |
15 | Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point. | 9 | 102 | 918 |
16 | Transportation of metal | 21.57 | 163.64 | 3529.7148 |
17 | Transportation of 20 MM metal | 19.05 | 414.36 | 7893.558 |
18 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms. | 9 | 156.36 | 1407.24 |
19 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 10 Kms. and part there of upto 30 Kms. | 3.27 | 268.47 | 877.8969 |
20 | Transportation of sand | 41.78 | 208.8 | 8723.664 |
21 | Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock. | 23.73 | 165.28 | 3922.0944 |
22 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 9 | 128.07 | 1152.63 |
23 | Transportation rates for Col, fuel wood, iron work, steel G.I sheets paints, oils, pipes and machinery etc | 1.175 | 268.47 | 315.45225 |
24 | Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 83.08 | 132.38 | 10998.1304 |
25 | Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum | 55.36 | 214.16 | 11855.8976 |
26 | Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting) | 69.2 | 501.21 | 34683.732 |
27 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 3459.52 | 73.4 | 253928.768 |
28 | Surface dressing of ground, including removing vegetation, and/ or unequalities not exceeding 15cm deep and disposal of rubbish lead upto 20m And lift upto1.5m-Dense or hard soil. | 1200 | 6.3 | 7560 |
29 | Collection of hard moorum including stacking at quarry. | 180 | 118.3 | 21294 |
30 | Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point. | 4.5 | 137.6 | 619.2 |
31 | SIGN BOARD | 1 | 2500 | 2500 |
32 | Sewage connection | 6 | 166.66 | 999.96 |