Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Sep-2024 11:33:24 PM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: PANDHANA Panchayat: SHAHPURA
Work Code: 1725007070/RC/22012034186009 (पंचपरमेश्‍वर सीसी रोड सह नाली निर्माण कार्य इन्‍दर)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/6/2013 Work start date : 20/6/2013
Present status : Earthern road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 138 kudalda Sanction Date : 25/6/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost MGNEGA Panchparmeshwar scheme3 Total
145000 97000 0 0 0 454000 0 551000 0 696000
Financial Sanction Details
Financial\Administrative Sanction No: 10 kudalda Financial\Administrative Sanction Date 13/8/2013
Fin. Sanc. Amt. (in Rs) NREGA:242000 MGNEGA
0
Panchparmeshwar
454000
Scheme 3
0
Total
696000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Dag-beling-Single spade stroke minimum 75mm deep000
2Dag-beling-Double spade "v" shaped stroke 100mm deep2500.5125
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)161.753177.8514009.15
4Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used155.55118.618448.23
5False work for R.C.C. and P.C.C. work in plinth and foundation225154.234695
6Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)2506.31575
7Collection of approved soil having CBR not less then 12, including stacking at quarry.160.85118.819108.98
8Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 166.857.51251.375
9Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 155.5406220
10Transportation of metal 393.89165.4565169.1005
11Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.7160.8523.63796.06
12Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. -Loose or soft soil for Road Work178.581.214494.2
13Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-oose or soft soil for Well Work000
14Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work000
15work charge11700017000
Total Activity 696000
S.NoMaterialQuantityUnit PriceTotal
120 MM B.T.METAL1000132.22132220
2Cement950300285000
3Display board115001500
4Empty Cement Bag40083200
5Hire Charges of Concrete mixer9001816200
6hume pipe100066000
7murrom150160.6524097.5
8sand cum100066.8966890
9Transpotation Charges155007500
10सेन्‍टीग180008000
Total Material 551000