S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared. | 30525 | 1.8 | 54945 |
2 | Extra for every additional Lead beyond 50metres or part thereof upto 200 m for every 50 m lead | 1074.85 | 94.4 | 101465.84 |
3 | Extra for every additional lift of 1.5 m or part there of-Loose/soft soil and dense/hard soil | 2687.13 | 12.6 | 33857.838 |
4 | Transportation rates for Boulders, Laterite, rubble pitching stones and excavated hard rock. | 61.6 | 135.01 | 8316.616 |
5 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 2420 | 84.87 | 205385.4 |
6 | Earth work in rough excavation,filling excavated earth into depressions on banking as directed ,top surface to be levelled and neatly dressed.-Loose or soft soil | 5374.25 | 52.7 | 283222.975 |
7 | 22cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014 | 280 | 259.3 | 72604 |
8 | SIGN BOARD | 1 | 5000 | 5000 |