S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 437.25 | 1.6 | 699.6 |
2 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil | 101.25 | 97.7 | 9892.125 |
3 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 101.25 | 224 | 22680 |
4 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 0 | 0 | 0 |
5 | 22cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014 | 150 | 181.4 | 27210 |
6 | Transportation of metal | 567 | 87.48 | 49601.16 |
7 | Transportation of metal | 756 | 94.32 | 71305.92 |
8 | Transportation of metal | 33 | 111.78 | 3688.74 |
9 | Transportation of metal | 50.625 | 18 | 911.25 |
10 | Transportation of metal | 1890 | 13.5 | 25515 |
11 | FOR EARTHEN DAM - Benching the seat of embankment over to an average depth of 15cm and cross slope of 1:12 including earth work removing the rubbish upto a distance of 50m including dressing. | 89.1 | 89.45 | 7969.995 |
12 | FOR EARTHEN DAM - Excavation of puddle trench for earthen embankment to proper side slopes and bed grade including shoring wherever necessary dressing 50m lead and 1.5m lift | 35.4375 | 97.7 | 3462.24375 |
13 | FOR EARTHEN DAM - Excavation of puddle trench for earthen embankment to proper side slopes and bed grade including shoring wherever necessary dressing 50m lead and 1.5m lift | 15.1875 | 224 | 3402 |
14 | FOR EARTHEN DAM - Excavation of puddle trench for earthen embankment to proper side slopes and bed grade including shoring wherever necessary dressing 50m lead and 1.5m lift | 1890 | 97.7 | 184653 |
15 | FOR EARTHEN DAM - Puddle filling of good clay including lead upto 50m including mixing watering and kneeding by tamping ramming and laying etc. | 50.625 | 292.5 | 14807.8125 |
16 | work charge | 1 | 20580 | 20580 |