Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 05:25:55 PM 
Back  
State: MADHYA PRADESH District: KHANDWA Block: BALADI Panchayat: BHAGWANPURA
Work Code: 1725001005/WC/9993645960 (PARLOKESHN TALAB I T I KE PAS )
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 26/1/2014 Work start date : 8/2/2014
Present status : Non-existent Proposed Status : Earthen Dam
Tech Sanction Details
Technical Sanction No. : 000580/2013 Sanction Date : 7/2/2014
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
269000 178000 0 0 0 0 0 178000 0 447000
Financial Sanction Details
Financial\Administrative Sanction No: 00024/2013 Financial\Administrative Sanction Date 8/2/2014
Fin. Sanc. Amt. (in Rs) NREGA:447000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
447000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises437.251.6699.6
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil101.2597.79892.125
3Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil101.2522422680
4Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m000
522cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014150181.427210
6Transportation of metal 56787.4849601.16
7Transportation of metal 75694.3271305.92
8Transportation of metal 33111.783688.74
9Transportation of metal 50.62518911.25
10Transportation of metal 189013.525515
11FOR EARTHEN DAM - Benching the seat of embankment over to an average depth of 15cm and cross slope of 1:12 including earth work removing the rubbish upto a distance of 50m including dressing.89.189.457969.995
12FOR EARTHEN DAM - Excavation of puddle trench for earthen embankment to proper side slopes and bed grade including shoring wherever necessary dressing 50m lead and 1.5m lift35.437597.73462.24375
13FOR EARTHEN DAM - Excavation of puddle trench for earthen embankment to proper side slopes and bed grade including shoring wherever necessary dressing 50m lead and 1.5m lift15.18752243402
14FOR EARTHEN DAM - Excavation of puddle trench for earthen embankment to proper side slopes and bed grade including shoring wherever necessary dressing 50m lead and 1.5m lift189097.7184653
15FOR EARTHEN DAM - Puddle filling of good clay including lead upto 50m including mixing watering and kneeding by tamping ramming and laying etc.50.625292.514807.8125
16work charge12058020580
Total Activity 447000
S.NoMaterialQuantityUnit PriceTotal
122 CM Piching Bolder Supplyes941009400
2Display board115001500
3Lead of Casing Soil 2.50 Km62012577500
4Transportation Of muram45012556250
5Transpotation of Puddle Earth501005000
6पानी टेकर18901528350
Total Material 178000