State: MADHYA PRADESH District: DHAR Block: NALCHHA Panchayat: Silotiya
Work Code: 1722005027/RC/22012034340201 (सुदुर खेत सदक कनेरीया से जगदीश के खेत )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2017-2018 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 21/4/2017 Work start date : 30/5/2017
Present status : Gravel Road Proposed Status : Repair & maint of Gravel Road Roads for Comm
Tech Sanction Details
Technical Sanction No. : 30(17-18) Sanction Date : 18/5/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
450000 300000 0 0 0 0 0 300000 0 750000
Financial Sanction Details
Financial\Administrative Sanction No: 20(17-18) Financial\Administrative Sanction Date 20/5/2017
Fin. Sanc. Amt. (in Rs) NREGA:750000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
750000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard110001000
2Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.1.849178850.6
3Filling foundation and around masonry work with moorum I/c ramming layers and watering.158.323.763761.208
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)3217.14.815442.08
5Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)2484.447.4117760.56
6False work for R.C.C. and P.C.C. work in plinth and foundation144.691.0813170.168
7Levelling - Headwork.-Below 5 m interval15901015900
8Levelling - Headwork.-5 to 10 m interval508.81508.8
9Transportation of metal 60.22500150500
10Transportation of metal 60.260036120
11Transportation rates for Lime (fat), Hydraulic or any other.145121740
12Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-300mm dia37425.99686.6
13Providing and laying reinforced cement concrete pipes N.P.3 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-900 mm dia.15501218600
14Compaction of soil for construction of subgrade & earthen shoulders with approved material, already spreaded at site, obtained from roadway cutting, drains, foundation of other structures or barrow pits, i/c making 4% camber and required grade by tractor24.7139534456.5
15Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work88.491981239.6
16Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Loose or soft soil96.27673.4
17Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Hard moorum117.810.321215.696
18Lossening of hard soil by ploughing the existing gound27139537665
19Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed50139569750
20Collection/Excavation of Gravel Material meeting the requirements of Hard moorum as detailed in RES SOR chapter No. 03 Notes Clause 3.2(C) including stacking and all leads and lifts up to the loading point at quarry.142.519027075
21Collection of river Borne material (RBM)(any mixture of sand & gravel)i/c boxing and all leads and lifts up to the loading point at quarry.124.512014940
22Spreading of material mixing by mix in place method by manual means or by tractor mount disk harrows to meet the requirements of Grading and Plasticity given in clause 2.2.2.2,2.2.2.3,2.2.3.1 and 2.2.3.2 of IRC SP: 77-2008 and grading by tractor mount.87.760052620
23Rolling & Compaction of granule sub-base of well graded-material Spreading in unformed layers with tractor mounted grader on prepared surface, mixing by mix in place, sprinkling of water till OMC and compacting with Smooth wheel rollers of 80 to 100 KN static weight to achieve the desired density, complete as pet Technical Specification Clause 401 of Specification for Rural Roads i/c all leads of water etc, complete.6330018900
24Setting out work (Reference pillars referencing bench mark and temporary bench mark):Painting/Marking of Reference/Working Bench Mark over existing permanent structure Fixing of Reference pegs made of local rough wood for making centre line and toe lines. Fixing of reference poles made of bamboos or jungle wood bellies etc.18120118120
Total Activity 750000
S.NoMaterialQuantityUnit PriceTotal
11904 tranportion of rcc hum pi62801680
220 MM Graded Metal21.3370014931
3BGSY SIGN BOARD (600X600MM)130003000
4Cement14430043200
5Centering and Shuttering70463220
6Compaction3006318900
7Compaction of Selected soil61518.411316
8compaction of sub grad earthen24.7139534456.5
9contigency11000010000
10FTSC-Field Technical supervisi110001000
11hume pipe3140.8618844.8
12hume pipe np3-600mm13746.59704.5
13Transportanion of hard Muram811395112995
14Transportation of GSB4630013800
15रेत120002000
Total Material 300000