Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Sep-2024 11:38:55 PM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: BARAUA(P)
Work Code: 1703004052/RS/22012034421323 (Nali Nirman Tulsidas ke makan se hakim rawat ke khet ki or sukhnakhiriya)
Work Category: Rural Sanitation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2018 Work start date : 22/7/2018
Present status : Not Exist Proposed Status : Constr of Open/Covered Grey Water Drain for Comm
Tech Sanction Details
Technical Sanction No. : 53/58 Sanction Date : 10/5/2018
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
532950 325750 0 0 0 0 0 326000 0 858700
Financial Sanction Details
Financial\Administrative Sanction No: 053/04 Financial\Administrative Sanction Date 15/5/2018
Fin. Sanc. Amt. (in Rs) NREGA:858700 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
859000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Dag-beling-Single spade stroke minimum 75mm deep7000.3210
2Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering.78.7588269457.5
3Add to item No. 0413 and 0415 if in place of 40mm metal.-If 12 mm graded metal is used39.383307.4130245.412
4False work for R.C.C. and P.C.C. work in plinth and foundation70147.810346
5Coursed rubble masonry second sort in plinth and foundation.-In Cement mortar 1:8 (1cement, 8sand)236.252082.1491896.125
6Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Flush pointing3578.52747.5
7Transportation of metal 78.75136.710765.125
8Transportation of sand116.24259.8330202.6392
9Transportation rates for Masonry stone.236.25211.2549907.8125
10Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.23.63123.032907.1989
11Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.21.09112.322368.8288
12Transportation rates for Lime (fat), Hydraulic or any other.33.47355.711905.279
13SIGN BOARD140004000
14Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed393.7552.720750.625
15contingency120989.954620989.9546
Total Activity 859000
S.NoMaterialQuantityUnit PriceTotal
120mm Chips33.47105035143.5
240 mm Metal78.75136.710765.125
3Cement500253126500
4Centering and Shuttering1948.1375948.1375
5Display board140004000
6Hire Charges of Concrete mixer28001600
7Hire Charges of Vibrator28001600
8Loosening Machine Rent393.752.71063.125
9Transportation charges10123.031230.3
10Transpotation Charges236.25211.2549907.8125
11रेत116.2480092992
Total Material 326000