S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Cutting down trees (exceeding 30cm girth, grubbing uproot, filling pits and levelling off ground, lopping branches, trimming, removing not exceeding 50meter & staking serviceable material and cleaning site.-Girth exceeding 150 cm and not exceeding 200 cm | 1 | 32000 | 32000 |
2 | Medium shrub jungle (25% to 50% area covered by shrubs) clearance involving removal of grass. Shrubs, bushes and twigs, excluding uprooting out (for survey works) | 1 | 20000 | 20000 |
3 | Cement Mortar 1:8 ( 1 cement, 8 sand ) | 1 | 6000 | 6000 |
4 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard moorum | 1 | 15000 | 15000 |
5 | Earth work in rough excavation, filling excavated earth into depressions on banking as directed, top surface to be levelled and neatly dressed.-Dense or hard soil | 1 | 9000 | 9000 |