Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Jun-2024 06:33:49 PM 
Back  
State: MADHYA PRADESH District: DHAR Block: BADNAWAR Panchayat: Muradka
Work Code: 1722001066/LD/3799438796 (मुक्तिधाम शेड निमार्ण मुरडका)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/4/2013 Work start date : 25/7/2013
Present status : Existing Proposed Status : Development of Waste Land
Tech Sanction Details
Technical Sanction No. : 227/66 Sanction Date : 25/7/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost VIDAYAK NIDHI scheme2 scheme3 Total
97725.9 66274.09 0 0 31999.58 0 0 98300 0 195999.57
Financial Sanction Details
Financial\Administrative Sanction No: 00/66 Financial\Administrative Sanction Date 25/7/2013
Fin. Sanc. Amt. (in Rs) NREGA:164000.42 VIDAYAK NIDHI
31999.58
Scheme 2
0
Scheme 3
0
Total
196000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil7.7365502.45
2Surface dressing of ground, including removing vegetation, and/ or unequalities not exceeding 15cm deep and disposal of rubbish lead upto 50m And lift upto1.5m-Dense or hard soil25005.513750
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal)1.721909.23283.824
4Providing and laying damp proof course 50mm thick with C.C.1:2:4 with 20mm size graded stone aggregate. including curing.14.66185.72722.362
5Coursed rubble masonry second sort in plinth and foundation.-In Cement mortar 1:8 (1cement, 8sand)13.251859.724641.025
6Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height9068.36147
7Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Raised and cut pointing24116.92805.6
8Providing corrugated C.I. sheet of class III roofing fixed with galvanised iron J or L hooks bolts and nuts 8mm diameter with bitumen and G.I. limpet washers or with complete excluding the cost of purlins, rafters and trusses.-0.80 mm thick sheet.27.95777.921742.305
9Providing ridges or hips 600mm over all in plain G.I. sheet class III fixed with galvanised iron J or L hooks bolts and nuts 8mm diameter G.I. limpet bitumen washers complete.-0.80 mm thick sheet.4388.41553.6
10Collection of approved soil having CBR not less then 12, including stacking at quarry.380.27105.340042.431
11Transportation of metal 380.27146.755785.609
12Labour only for moorum, screening or binding material as per MOST 2004 clause 400.2.6 spreading on boulder or WBM coat as per MOST 2004 clause 404.2.7380.2723.68974.372
13Providing and fixing to wall ceiling and floor galvanised mild steel tubes (medium grade) of the following nominal bore, tube fittings and clamps including walling making good the wall, ceiling and floor-50 mm dia.30251.27536
14Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work000
15contingency651316513
Total Activity 196000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL0.95469.15445.6925
240 M.M. METAL1.58332.47525.3026
3Cenment252907250
4contengency651316513
5hume pipe302006000
6Iron Pipe000
7Masonry Stone2.121191.872526.7644
8R.R. stone (other than granite11.132522804.76
9Sand6.45472.953050.5275
10steel work415.2668.328362.258
11Transportation of soft moorum380.27107.2840795.3656
Total Material 98300