Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Sep-2024 01:30:02 AM 
Back  
State: MADHYA PRADESH District: SHAJAPUR Block: MOMAN BADODIYA Panchayat: DANGICHA
Work Code: 1719006032/RC/22012034395931 (CC Nala nirman jaiynarayan ke makan se nale tak dangeecha)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 15/8/2018 Work start date : 28/9/2018
Present status : Cement concrete Proposed Status : Constr of Cement Concrete Roads for Comm
Tech Sanction Details
Technical Sanction No. : 32/415/18 Sanction Date : 17/9/2018
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
74200 0 0 0 230800 0 0 231000 0 305000
Financial Sanction Details
Financial\Administrative Sanction No: 32/08/2018 Financial\Administrative Sanction Date 27/9/2018
Fin. Sanc. Amt. (in Rs) NREGA:74200 Panchparmeshwar
230800
Scheme 2
0
Scheme 3
0
Total
305000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil16270.811469.6
2Filling foundation and around masonry work with moorum I/c ramming layers and watering.18158.32849.4
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)31.683075.697435.008
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)16.22204.635714.52
5False work for R.C.C. and P.C.C. work in plinth and foundation576185.4106790.4
6Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars1059.147.950730.89
Total Activity 305000
S.NoMaterialQuantityUnit PriceTotal
120 mm metal transport100026.9226920
240 mm Metal90012.8611574
3CEMENT(BEGS)30517252460
4Centering and Shuttering122.157670329.6
5FALSE WORK115001500
6sand cum100020.120100
7steel purches(8mm 10mm 12mm)1059.143.145647.21
8Transportanion of hard Muram18119.32147.4
Total Material 231000