S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 1500 | 1500 |
2 | Site clearance, cutting grass, raking into heaps and removing off the premises | 1 | 1.6 | 1.6 |
3 | Work charge | 1 | 12419 | 12419 |
4 | Pumping out water caused by springs tidal or river seepage, broken water mains or drains or well point pumping and the like. | 60 | 58 | 3480 |
5 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 2 | 3234.3 | 6468.6 |
6 | False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift | 2.701 | 182.9 | 494.0129 |
7 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Lime Mortar 1: 2(1lime, 2sand) | 75 | 2595 | 194625 |
8 | Add extra for brick masonry circular in plan, I/c wells to a mean radius not exceeding 6m (Such as well stening and other similar type of works) | 75 | 237.9 | 17842.5 |
9 | Add to item no.0605 and 0609 for well staining-For every 3meter up to 15 meter depth. | 64.77 | 378.63 | 24523.8651 |
10 | Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Flush pointing | 182 | 78.5 | 14287 |
11 | Transportation of metal | 1 | 155.4 | 155.4 |
12 | Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting. | 36 | 867 | 31212 |
13 | Add in item No. 2401 for lift. (In well excavation)-For every 0.50 m after 1.5 m initial depth upto 6.0 m | 55 | 270.89 | 14898.95 |
14 | Add in item No. 2402 for lift. (In well excavation)-For every 0.50 m after 1.5 m initial depth upto 6.0 m | 36.285 | 831.47 | 30169.88895 |
15 | Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works) | 43.45 | 173.42 | 7535.099 |
16 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Loose or soft soil for Tank Work | 55 | 81.2 | 4466 |
17 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work | 55 | 167.58 | 9216.9 |
18 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed. | 57 | 609 | 34713 |
19 | Collection of quarried stone or rubble. | 66 | 181.1 | 11952.6 |
20 | Labour difference in case of old SoR | 1 | 9420 | 9420 |