Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Jun-2024 05:58:23 PM 
Back  
State: MADHYA PRADESH District: REWA Block: NAIGARHI Panchayat: DEWARI SENGARAN
Work Code: 1713007030/WC/81 (कूप निर्माण पेयजल कूप हरिजन बस्‍ती देवरी सेगरान)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2012-2013 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 11/5/2012 Work start date : 12/5/2012
Present status : Non-existent Proposed Status : Water Absorption Trench
Tech Sanction Details
Technical Sanction No. : 30/81 Sanction Date : 11/5/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
121000 137000 0 0 0 0 0 137000 0 258000
Financial Sanction Details
Financial\Administrative Sanction No: 30/1 Financial\Administrative Sanction Date 12/5/2012
Fin. Sanc. Amt. (in Rs) NREGA:258000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
258000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Pumping out water caused by springs tidal or river seepage, broken water mains or drains or well point pumping and the like.220.1651.611360.256
2Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m17.52151.32650.776
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)17.52151.32650.776
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal)4.6071642.37566.0761
5Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand)37.5972283.185837.7107
6Add for class 35 T.M. chimney kiln burnt brick in item no.0603 and 060537.597450.116922.4097
7Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars50432150
815mm thick cement plaster on rough side of wall in-Cement mortar 1:6 (1cement, 6sand)118.6373.18671.853
9Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 50 Kms. and part there of upto 100 Kms.11010010100
10Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 100 Kms.4.8354662253.11
11Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.37.59765324550.841
12Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.12.45613.657639.9425
13Labour only for boulder soling hand packed excluding consolidation.14.888.71312.76
14Labour only for spreading, hand packing, and levelling to gradient and required camber as per MOST 2004 clause 404.3.3 of metal grading-2 & 3 as per MOST 2004 clause 400.2.5 including dressing.10.81546.5502.8975
15Providing and fixing on Wall face Asbestos Cement building pipe of the following nominal size including jointing with sun yarn soaked in bitumen and cement mortar 1:2 (1cement, 2sand) complete .-100 mm dia.590450
16Earth work for well excavation-Lift from 1.5 m. to 2.00 m.5.373106569.538
17Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil16.111001611
18Earth work for well excavationSoil Lift from 1.5 m. to 2.00 m.2772.661961.82
19Earth work for well excavation-Soil lift from 2.00 m. to 2.50 m.5.373112601.776
20Earth work for well excavation-soil lift from 2.50 m. to 3.00 m.5.373118634.014
21Earth work for well excavation-Soil lift from 3.00 m. to 3.50 m.5.373124666.252
22Earth work for well excavation-Soil lift from 3.50 m. to 4.00 m.5.373130698.49
23Earth work for well excavation-Hard moorum lift from 5.50 m. to 6.00 m.5.373162.8874.7244
24Earth work for well excavation-Hard moorum lift from 4.00 m. to 4.50 m.5.373144.8778.0104
25Earth work for well excavation-Hard moorum lift from 4.50 m. to 5.00 m.5.373150.8810.2484
26Earth work for well excavation-Hard moorum lift from 5.00 m. to 5.50 m.5.373156.8842.4864
27Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 6.00 m. to 6.50 m.5.3733862073.978
28Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 6.50 m. to 7.00 m.5.373397.72136.8421
29Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 7.00 m. to 7.50 m.5.373408.52194.8705
30Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 7.50m. to 8.00 m.5.373419.32252.8989
31Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 8.00 m. to 8.50 m.5.373430.12310.9273
32Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 10.50 m. to 11.00 m.5.3734872616.651
33Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 8.50 m. to 9.00 m.5.373440.92368.9557
34Earth work for well excavation-Disintegrated or soft rock (not requiting blasting) lift from 9.00 m. to 9.50 m.5.3734512423.223
35Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 9.50 m. to 10.00 m.5.3734622482.326
36Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 10.00 m. to 10.50 m.5.3734792573.667
37Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 11.00 m. to 11.50 m.5.3735002686.5
38Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 11.50 m. to 12.00 m.5.3735142761.722
39Earth work for well excavation-Hard rock requiring chiselling (where blasting is prohibited) lift from 12.00 m. to 12.50 m.3.532633.42237.1688
40Earth work for well excavation-Hard rock requiring chiselling (where blasting is prohibited) lift from 12.50 m. to 13.00 m.3.532647.22285.9104
41Earth work for well excavation-Hard rock requiring chiselling (where blasting is prohibited) lift from 13.00 m. to 13.50 m.3.5326612334.652
42Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works)42.834104.544477.86636
43Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.14.805106.41575.252
44Collection of quarried stone or rubble.10.8276.52986.2
45SIGN BOARD110001000
46contingency11084510845
47Labour difference in case of old SoR160006000
Total Activity 258000
S.NoMaterialQuantityUnit PriceTotal
1Brick28.7763176.791412.7192
2Cement2.326777618086.976
3Conteng 111070810708
4Sand (mortar)12.451348.7616792.062
Total Material 137000