S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Pumping out water caused by springs tidal or river seepage, broken water mains or drains or well point pumping and the like. | 220.16 | 51.6 | 11360.256 |
2 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 17.52 | 151.3 | 2650.776 |
3 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 17.52 | 151.3 | 2650.776 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal) | 4.607 | 1642.3 | 7566.0761 |
5 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand) | 37.597 | 2283.1 | 85837.7107 |
6 | Add for class 35 T.M. chimney kiln burnt brick in item no.0603 and 0605 | 37.597 | 450.1 | 16922.4097 |
7 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars | 50 | 43 | 2150 |
8 | 15mm thick cement plaster on rough side of wall in-Cement mortar 1:6 (1cement, 6sand) | 118.63 | 73.1 | 8671.853 |
9 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 50 Kms. and part there of upto 100 Kms. | 1 | 10100 | 10100 |
10 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 100 Kms. | 4.835 | 466 | 2253.11 |
11 | Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock. | 37.597 | 653 | 24550.841 |
12 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 12.45 | 613.65 | 7639.9425 |
13 | Labour only for boulder soling hand packed excluding consolidation. | 14.8 | 88.7 | 1312.76 |
14 | Labour only for spreading, hand packing, and levelling to gradient and required camber as per MOST 2004 clause 404.3.3 of metal grading-2 & 3 as per MOST 2004 clause 400.2.5 including dressing. | 10.815 | 46.5 | 502.8975 |
15 | Providing and fixing on Wall face Asbestos Cement building pipe of the following nominal size including jointing with sun yarn soaked in bitumen and cement mortar 1:2 (1cement, 2sand) complete .-100 mm dia. | 5 | 90 | 450 |
16 | Earth work for well excavation-Lift from 1.5 m. to 2.00 m. | 5.373 | 106 | 569.538 |
17 | Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil | 16.11 | 100 | 1611 |
18 | Earth work for well excavationSoil Lift from 1.5 m. to 2.00 m. | 27 | 72.66 | 1961.82 |
19 | Earth work for well excavation-Soil lift from 2.00 m. to 2.50 m. | 5.373 | 112 | 601.776 |
20 | Earth work for well excavation-soil lift from 2.50 m. to 3.00 m. | 5.373 | 118 | 634.014 |
21 | Earth work for well excavation-Soil lift from 3.00 m. to 3.50 m. | 5.373 | 124 | 666.252 |
22 | Earth work for well excavation-Soil lift from 3.50 m. to 4.00 m. | 5.373 | 130 | 698.49 |
23 | Earth work for well excavation-Hard moorum lift from 5.50 m. to 6.00 m. | 5.373 | 162.8 | 874.7244 |
24 | Earth work for well excavation-Hard moorum lift from 4.00 m. to 4.50 m. | 5.373 | 144.8 | 778.0104 |
25 | Earth work for well excavation-Hard moorum lift from 4.50 m. to 5.00 m. | 5.373 | 150.8 | 810.2484 |
26 | Earth work for well excavation-Hard moorum lift from 5.00 m. to 5.50 m. | 5.373 | 156.8 | 842.4864 |
27 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 6.00 m. to 6.50 m. | 5.373 | 386 | 2073.978 |
28 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 6.50 m. to 7.00 m. | 5.373 | 397.7 | 2136.8421 |
29 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 7.00 m. to 7.50 m. | 5.373 | 408.5 | 2194.8705 |
30 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 7.50m. to 8.00 m. | 5.373 | 419.3 | 2252.8989 |
31 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 8.00 m. to 8.50 m. | 5.373 | 430.1 | 2310.9273 |
32 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 10.50 m. to 11.00 m. | 5.373 | 487 | 2616.651 |
33 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 8.50 m. to 9.00 m. | 5.373 | 440.9 | 2368.9557 |
34 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting) lift from 9.00 m. to 9.50 m. | 5.373 | 451 | 2423.223 |
35 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 9.50 m. to 10.00 m. | 5.373 | 462 | 2482.326 |
36 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 10.00 m. to 10.50 m. | 5.373 | 479 | 2573.667 |
37 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 11.00 m. to 11.50 m. | 5.373 | 500 | 2686.5 |
38 | Earth work for well excavation-Disintegrated or soft rock (not requiting blasting)lift from 11.50 m. to 12.00 m. | 5.373 | 514 | 2761.722 |
39 | Earth work for well excavation-Hard rock requiring chiselling (where blasting is prohibited) lift from 12.00 m. to 12.50 m. | 3.532 | 633.4 | 2237.1688 |
40 | Earth work for well excavation-Hard rock requiring chiselling (where blasting is prohibited) lift from 12.50 m. to 13.00 m. | 3.532 | 647.2 | 2285.9104 |
41 | Earth work for well excavation-Hard rock requiring chiselling (where blasting is prohibited) lift from 13.00 m. to 13.50 m. | 3.532 | 661 | 2334.652 |
42 | Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works) | 42.834 | 104.54 | 4477.86636 |
43 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 14.805 | 106.4 | 1575.252 |
44 | Collection of quarried stone or rubble. | 10.8 | 276.5 | 2986.2 |
45 | SIGN BOARD | 1 | 1000 | 1000 |
46 | contingency | 1 | 10845 | 10845 |
47 | Labour difference in case of old SoR | 1 | 6000 | 6000 |