S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Work charge | 1 | 27419 | 27419 |
3 | Filling foundation and around masonry work with moorum I/c ramming layers and watering. | 332 | 158.3 | 52555.6 |
4 | Add extra item no. 1274 for quarried boulder pitching. | 1660 | 121.4 | 201524 |
5 | Transportation rates for Masonry stone. | 365.2 | 333.06 | 121633.512 |
6 | Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock. | 332 | 214.11 | 71084.52 |
7 | Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Dense or hard soil | 664 | 96.2 | 63876.8 |
8 | Collection of hard moorum including stacking at quarry. | 332 | 142.5 | 47310 |
9 | 22cm thick dry stone pitching (without quarry spalls) with individual stone of 22cm depth and minimum size 0.014 | 1659.98 | 260.6 | 432590.788 |