S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 83.09 | 290 | 24096.1 |
2 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 45.92 | 301.9 | 13863.248 |
3 | Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used | 31.98 | 301.9 | 9654.762 |
4 | False work for R.C.C. and P.C.C. work in plinth and foundation | 44.05 | 46.4 | 2043.92 |
5 | Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide) | 90.5 | 1.4 | 126.7 |
6 | Cement concrete [1:3:6] using 40mm sizeB.H.G. metal including all cost conveyancetaxes,royalit,watering curring, etc. complete | 0 | 0 | 0 |
7 | Loading of metal in truck, dumper etc. | 36.23 | 27 | 978.21 |
8 | Laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-600mm dia | 50 | 34.3 | 1715 |
9 | Cement concrete [1:2:4] using 12mm size H.G. Chips including all cost conveyancetaxes,royalit,watering curring, etc. complete | 0 | 0 | 0 |
10 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 62.78 | 67.8 | 4256.484 |
11 | Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point. | 36.23 | 46.2 | 1673.826 |
12 | 0317 Dag-beling
(b) Double spade "v" shaped stroke 100mm deep
| 150 | 0.3 | 45 |
13 | 2502 ,318 earth work in bulk excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5nm with extra for every additional lead 50m to 200m | 0 | 0 | 0 |
14 | 2518 collection of sand including scriming washing statingand all lead and lift | 0 | 0 | 0 |