State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: SAKRAYA
Work Code: 1702001037/RC/22012034348011 (सी.सी.रोड राजेंद्र यादव के मकान से केवल के मकान तक।)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2017-2018 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 31/5/2017 Work start date : 13/3/2018
Present status : Earthern road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 23/1037 Sanction Date : 31/5/2017
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
112575 0 0 0 637925 0 0 638000 0 750500
Financial Sanction Details
Financial\Administrative Sanction No: 5/1037 Financial\Administrative Sanction Date 31/5/2017
Fin. Sanc. Amt. (in Rs) NREGA:112575 Panchparmeshwar
637925
Scheme 2
0
Scheme 3
0
Total
751000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises201723440
2Dag-beling-Double spade "v" shaped stroke 100mm deep7150.5357.5
3Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete.148.7638.894989.56
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:4:8 (1cement, 4sand, 8metal)1253194.3399287.5
5False work for R.C.C. and P.C.C. work in plinth and foundation210.41132.527879.325
6Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)419.46.32642.22
7Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 30 Kms. and part there of upto 50 Kms.127673.185483.7
8Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.19600096000
9Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed - Dense or hard soil for Well Work14588.412818
10Field Technical Supervisior Charge-FTSC12800028000
Total Activity 751000
S.NoMaterialQuantityUnit PriceTotal
1complite materail punch parmes1637925637925
Total Material 638000