S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal) | 80.63 | 1971.5 | 158962.045 |
2 | Labour only for item no. 0413 (for any proportion of cement concrete) | 80.63 | 336.2 | 27107.806 |
3 | False work for R.C.C. and P.C.C. work in plinth and foundation | 55 | 114.8 | 6314 |
4 | Deduct for concrete unvibrated in item no. 0425 | 80.63 | 110 | 8869.3 |
5 | Transportation of metal | 80.5 | 50.58 | 4071.69 |
6 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms. | 68.53 | 151.8 | 10402.854 |
7 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 34.67 | 162.72 | 5641.5024 |
8 | Loading of metal in truck, dumper etc. | 80.5 | 21.96 | 1767.78 |
9 | Unloading of metal in truck, dumper etc. | 80.5 | 10.98 | 883.89 |
10 | Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing. | 80.5 | 34 | 2737 |
11 | Cement concrete [1:2:4] using 12mm size H.G. Chips including all cost conveyancetaxes,royalit,watering curring, etc. complete | 1 | 1 | 1 |
12 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 80.63 | 67.8 | 5466.714 |
13 | Collection of hard moorum including stacking at quarry. | 80.5 | 109.3 | 8798.65 |
14 | contingency | 1 | 1500 | 1500 |