Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 28-Sep-2024 01:07:25 AM 
Back  
State: MADHYA PRADESH District: SHAJAPUR Block: MOMAN BADODIYA Panchayat: MANGLIYA
Work Code: 1719006010/RC/22012034166570 (CC road pp I manrega mangliya devkaran to bhavarla)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2012-2013 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 26/1/2012 Work start date : 1/3/2013
Present status : No Road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 10/18 Sanction Date : 18/4/2012
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
58559 38706 0 0 145349 0 0 185000 0 242614
Financial Sanction Details
Financial\Administrative Sanction No: 10/1555 Financial\Administrative Sanction Date 26/12/2012
Fin. Sanc. Amt. (in Rs) NREGA:97265 Panchparmeshwar
145349
Scheme 2
0
Scheme 3
0
Total
243000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)80.631971.5158962.045
2Labour only for item no. 0413 (for any proportion of cement concrete)80.63336.227107.806
3False work for R.C.C. and P.C.C. work in plinth and foundation55114.86314
4Deduct for concrete unvibrated in item no. 042580.631108869.3
5Transportation of metal 80.550.584071.69
6Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms.68.53151.810402.854
7Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.34.67162.725641.5024
8Loading of metal in truck, dumper etc.80.521.961767.78
9Unloading of metal in truck, dumper etc.80.510.98883.89
10Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.80.5342737
11Cement concrete [1:2:4] using 12mm size H.G. Chips including all cost conveyancetaxes,royalit,watering curring, etc. complete111
12Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work80.6367.85466.714
13Collection of hard moorum including stacking at quarry.80.5109.38798.65
14contingency115001500
Total Activity 243000
S.NoMaterialQuantityUnit PriceTotal
120 MM B.T.METAL68.5380054824
2CEMENT.24027064800
3Centering and Shuttering5574.24081
4contangency and work charges135003500
5Mason (semi skilled)182003600
6sand cum34.6770024269
7Transportaion of sand (Trip)34.67162.725641.5024
8Transportanion of hard Muram80.550.584071.69
9transpotation of matel68.53151.810402.854
10Vibrator (Per Day)128009600
Total Material 185000