State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: NONKISARAI(P)
Work Code: 1703004039/RC/22012034292063 (PATHAR KHARNJA NIRMAN MEN ROAD SE TEJPAL KE MAKAN TAK SEKHUPUR)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 2/10/2015 Work start date : 8/12/2015
Present status : Earthern road Proposed Status : Kharanja (Brick/Stone)
Tech Sanction Details
Technical Sanction No. : 039/3586 Sanction Date : 24/11/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
272742 126258 0 0 0 0 0 127000 0 399000
Financial Sanction Details
Financial\Administrative Sanction No: 039/27 Financial\Administrative Sanction Date 30/11/2015
Fin. Sanc. Amt. (in Rs) NREGA:399000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
399000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Contingency111709.9411709.94
2Dag-beling-Single spade stroke minimum 75mm deep5000.3150
3Hammer dressed 15cm thick stone paving laid in camber in moorum bedding and filled with moorum mortar.900226.1203490
4Stacking without boxing.-Puddle earth, moorum, sand or kankar243.7510.52559.375
5Transportation rates for Masonry stone.135578.3478075.9
6Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars.233.52200.8146893.1512
7Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.21044.19261
8Collection of hard moorum including stacking at quarry.243.75140.734295.625
9Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Loose or soft soil.90013.812420
Total Activity 399000
S.NoMaterialQuantityUnit PriceTotal
1contangency and work charges11288.941288.94
2खण्‍डा परिवहन135578.3478075.9
3मुरम परिवहन (1)233.52200.8146893.1512
Total Material 127000