State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: PATAI
Work Code: 1713004007/RC/22012034291432 (खेत सडक निर्माण शांतिधाम से बघेलान टोला )
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2015-2016 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/8/2015 Work start date : 1/12/2015
Present status : No Road Proposed Status : Sand Moram
Tech Sanction Details
Technical Sanction No. : 1601/07/37 Sanction Date : 26/11/2015
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
548000 355000 0 0 0 0 0 355000 0 903000
Financial Sanction Details
Financial\Administrative Sanction No: 18/07/37 Financial\Administrative Sanction Date 4/12/2015
Fin. Sanc. Amt. (in Rs) NREGA:903000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
903000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard015000
2Site clearance, cutting grass, raking into heaps and removing off the premises48001.88640
3Work charge110001000
4Dag-beling-Single spade stroke minimum 75mm deep24000.2480
5Transportation of metal 1655114.1188835.5
6Providing and laying reinforced cement concrete pipes N.P.2 for culverts including pointing ends, and fixing collar with cement martar 1:2 complete.-300mm dia147309.445481.8
7Compaction of embankment with approved materials as per clause 301.4 & 301.5 of specifications for rural roads(MORD), already spreaded at site, obtained from roadway cutting, excavated from drains, foundation of other structures or from borrow pit, making1310.1621.528168.44
8Compaction of hard shoulder collected at site, i/c making 4-5% camber by tractor mounted grader or labourers, watering at OMC and compacting with 80 to 100 kN static weight rollers to achieve desired density minimum 100% of the MDD as per IS:2720 (Part-7)1247.239.649389.12
9Construction of gravel surface course by naturally occurred gravel or river born material or by crushed metal or mixture of two or more in appropriate grading confirming to clause 2.2.2.2, plasticity characteristics of fines as per clause 2.2.3 of IRC:SP:82.4578.347651.92
10Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.65587.357181.5
11Collection of puddle earth including stacking at quarry1174.2112.8132449.76
12Collection of hard moorum including stacking at quarry.1174.2130.8153585.36
131902 Transportion of metal908208.4189227.2
Total Activity 903000
S.NoMaterialQuantityUnit PriceTotal
110mm Chips140004000
2Compaction of Earth Work225023.1252020
3contangency and work charges170007000
4HumePipes154005400
5Rolling of Muram125391.248900
6Rolling of Soil125023.2129012.5
7Soil transport425021.3290610
8Transpotation of Mooram125063.2779087.5
9Trasportaion of water18502138850
Total Material 355000