S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 9 | 3 | 27 |
2 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil | 30.75 | 117.5 | 3613.125 |
3 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 9 | 149.6 | 1346.4 |
4 | Collection of quarried stone or rubble.-Maximum size 0.014 cum | 9 | 217.5 | 1957.5 |
5 | Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point. | 4.5 | 203.9 | 917.55 |
6 | Transportation of metal | 18 | 144.44 | 2599.92 |
7 | Transportation rates for Moorum, sand, earth, surkhi, fly ash, cement and mortars. | 4.5 | 113.04 | 508.68 |
8 | work charge | 1 | 328.3 | 328.3 |