State: MADHYA PRADESH District: KHANDWA Block: PANDHANA Panchayat: DIWAL
Work Code: 1725007024/WC/126 (निर्मल नीर कूप आदीवासी मोहल्‍ला दीवाल )
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2008-2009 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 1/12/2008 Work start date : 1/1/2009
Present status : Non-existent Proposed Status : Mini Percolation tank
Tech Sanction Details
Technical Sanction No. : 1244rm Sanction Date : 17/2/2009
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
113400 75600 0 0 0 0 0 75600 0 189000
Financial Sanction Details
Financial\Administrative Sanction No: 36rm Financial\Administrative Sanction Date 20/2/2009
Fin. Sanc. Amt. (in Rs) NREGA:189000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
189000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil11.5352.4604.172
2Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard moorum103.8472.987578.2432
3Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)28.26192.995453.8974
4Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting208.12321.3866885.6056
5Extra rates for quantities of work executed. In or under water or in foul condition (extra rate for the main item concerned is allowed on account of slow progress of works)208.0567.7214089.146
6Labour only for item no.040229.1220.87607.7344
7Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)4.111925.347913.1474
8Add to item No. 0413 and 0415 if in place of 40mm metal.-If 20 mm graded metal is used4.1175.73311.2503
9Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size)16.162077.0233564.6432
10False work for lintels slabs, columns, walls, sills, chhajjas balconies, beams, stair cases or ornamental moulded work, curved surface etc. cast in situ including all lead and lift198.08132.6426273.3312
11Steel work in single section including in cutting, hoisting fixing in position in R.S. joists, channels, angles, tee.46.7245.992148.6528
12Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars30048.1914457
13work charge191139113
Total Activity 189000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL70017.512250
2Blasting Holas601006000
3Cement(bori)12922529025
4Centering and Shuttering134503450
5DIESAL PUMP 109153455175
6Display board115001500
7IRON SARIYA3004513500
8PhotoCopy & Stationary3100300
9Photograph540200
10Sand (Filling)76004200
Total Material 75600