Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Jun-2024 04:35:05 AM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: MAUCHH(P)
Work Code: 1703004062/RC/22012034182330 (खरंजा निर्माण मानिक से धिरोली की ओर)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/4/2013 Work start date : 12/9/2013
Present status : Earthern road Proposed Status : Kharanja (Brick/Stone)
Tech Sanction Details
Technical Sanction No. : 62/255 Sanction Date : 20/6/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
174616 31122 0 0 0 0 0 31200 0 205738
Financial Sanction Details
Financial\Administrative Sanction No: 62/05. Financial\Administrative Sanction Date 8/7/2013
Fin. Sanc. Amt. (in Rs) NREGA:205438 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
206000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Dag-beling-Single spade stroke minimum 75mm deep3400.268
2Hammer dressed 15cm thick stone paving laid in camber in moorum bedding and filled with moorum mortar.612215.7132008.4
3Transportation rates for Masonry stone.76.5206.6415807.96
4Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.118.87132.8415790.6908
5Loading of metal in truck, dumper etc.118.8726.283123.9036
6Unloading of metal in truck, dumper etc.118.8713.141561.9518
7Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing.118.87414873.67
8Collection of hard moorum including stacking at quarry.118.87130.815548.196
9Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Dense or hard soil.62912.88051.2
10Sewage connection18604.798604.79
Total Activity 206000
S.NoMaterialQuantityUnit PriceTotal
1contangency14495.494495.49
2खण्‍डा परिवहन76.5187.0414308.56
3मुरम परिवहन (1)118.87103.6212317.3094
Total Material 31200