Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 04:27:39 PM 
Back  
State: MADHYA PRADESH District: DAMOH Block: BATIYAGARH Panchayat: KERBANA
Work Code: 1711003040/IF/22012034522570 (KAPIL DHARA KOOP NIRMAN BHUBANI BAI/KHUMAN SINGH KERBANA)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2019-2020 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 2/10/2019 Work start date : 29/12/2019
Present status : Not Exist Proposed Status : Bondry Block - Coastal Shelter Belt-Individuals
Tech Sanction Details
Technical Sanction No. : 1711003/2019-2020/13739/TS Sanction Date : 19/1/2020
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
97137.01 207186.03 3745.45 8504.53 0 0 0 220000 20240 336813.02
Financial Sanction Details
Financial\Administrative Sanction No: 1711003/2019-2020/13739/AS Financial\Administrative Sanction Date 19/1/2020
Fin. Sanc. Amt. (in Rs) NREGA:336978 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
337000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m86.9453.36277892799634639.36
2(b) C.C. 1:3:6 (1cement, 3sand, 6metal)1.323122.825757575764122.13
3Providing and laying in foundation, plinth and under floors cement concrete with 20mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work ( if 20 mm metal is used in place of 40mm metal in item number 04.13 & 04.15) (a) C.C. 1:2:4 (1cement, 2sand, 4metal)1.323867.318181818185104.86
4(c) CC 1:2:4 (1 cement, 2 sand, 4 graded stone aggregate 20mm nominal size)19.595235.38897396631102561.27
5Centering and shuttering including strutting , propping etc. and removal of form work for P.C.C. work in foundation, footing, bases for column5.07154.134122287968781.46
6(e) In Cement mortar 1:6 (1cement, 6sand)20.122767.0531809145155673.11
7(a) Mild steel and Medium tensile steel bars761.8568.78549583251352404.23
8(XXXI) 70 Km. Lead19.8700.59393939393913871.76
9(X) 5.0 Km. Lead18190.183423.24
10(X) 5.0 Km. Lead9148.8366666666671339.53
11(XV) 10 Km. Lead15.45205.6187702265373176.81
12(XV) 10 Km. Lead1.02204.970588235294209.07
13(b) Dense or hard soil52.43137.8264352469967226.24
14(I)1.50 m. to 2.00 m.13.36140.5823353293411878.18
15(X)6.00 m. to 6.50 m.4.81227.4199584199581093.89
16(XI)6.50 m. to 7.00 m.4.81239.6819126819131152.87
17(XII)7.00 m. to 7.50 m.4.81251.9438669438671211.85
18(XIII)7.50 m. to 8.00 m.4.81264.20790020791270.84
19(XIV)8.00 m. to 8.50 m.4.81276.4698544698541329.82
20(XV)8.50 m. to 9.00 m.4.81288.7318087318091388.8
21(XVI)9.00 m. to 9.50 m.4.81300.9937629937631447.78
22(XVII)9.50 m. to 10.00 m.4.81313.2557172557171506.76
23(XVIII)10.00 m. to 10.50 m.4.81325.5176715176721565.74
24(XIX)10.50 m. to 11.00 m.4.81340.9459459459461639.95
25(II)2.00 m. to 2.50 m.11.59149.9516824849011737.94
26(XX)11.00 m. to 11.50 m.4.81356.374220374221714.16
27(XXI)11.50 m. to 12.00 m.4.81371.8045738045741788.38
28(XXII)12.00 m. to 12.50 m.4.81387.2328482328481862.59
29(XXIII)12.50 m. to 13.00 m.4.81402.6611226611231936.8
30(XXIV)13.00 m. to 13.50 m.4.81418.0893970893972011.01
31(XXV)13.50 m. to 14.00 m.4.81433.5197505197512085.23
32(XXVI)14.00 m. to 14.50 m.4.81448.9480249480252159.44
33(XXVII)14.50 m. to 15.00 m.4.81464.3762993762992233.65
34(XXVIII) 15 m. to 15.5 m.4.81482.9833679833682323.15
35(XXIX) 15.5 m. to 16 m.4.81501.5883575883582412.64
36(III)2.50 m. to 3.00 m.10.02159.2804391217571595.99
37(XXX) 16 m. to 16.5 m.4.81520.1954261954262502.14
38(XXXI) 16.5 m. to 17 m.4.81538.8004158004162591.63
39(XXXII) 17 m. to 17.5 m.4.81557.4074844074852681.13
40(XXXIII) 17.5 m. to 18 m.4.81576.0124740124742770.62
41(IV)3.00 m. to 3.50 m.4.81168.538461538462810.67
42(V)3.50 m. to 4.00 m.4.81177.862785862786855.52
43(VI)4.00 m. to 4.50 m.4.81187.18711018711900.37
44(VII)4.50 m. to 5.00 m.4.81196.509355509356945.21
45(VIII)5.00 m. to 5.50 m.4.81205.83367983368990.06
46(IX)5.50 m. to 6.00 m.4.81215.1580041580041034.91
47Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders.18149.162684.88
48Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point.9208.0288888888891872.26
49Citizen Information Board of size 0.6 meter x 0.9 meter ( Individual works )12218.012218.01
Total Activity 317000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper2.75428852437.467
20084-Hire charges of Diesel truck - 9 tonne (without POL)1.576722423534.9614
30297-Stone Aggregate(single size): 10 mm nominal size4.45556302806.965
40367-Portland Cement8.8868551148975.1548
50368-White cement 0.0002157443.1488
60982-Coarse sand (zone III)0.89831028.16923.596128
70983-Fine sand (zone IV)17.17161076.2518480.9345
81004-Average rate of mild steel round bars for reinforcements7.9995519241533.404
91157-Stone for masonry work23.3369519.7512129.353775
101235-Diesel oil29.2944681992.0192
115001-Mobil oil1.0489182.9191.84381
126-Labour welfare fund/Cess12024020240
137335-Binding wire7.618555.58423.43623
147900-Modular common burnt clay bricks of class designation 7.5150.84.13622.804
15MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT2.15165251129.59
16MR6007-Hier Charges for Centering19.59380015674.4
17MR6032-Snowcem/ durocem0.00042778911.1156
18MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)14.897868210160.2996
19MR6091-WOOD-Kail wood 2nd class0.018115825.6286.44336
Total Material 182000