S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | (I) 1.50 m. to 3.00 m. | 1620 | 9.91827160493827 | 16067.6 |
2 | (II) 3.00 m to 4.50 m | 810 | 17.37 | 14069.7 |
3 | (b) C.C. 1:3:6 (1cement, 3sand, 6metal) | 20 | 3175.782 | 63515.64 |
4 | Providing and laying in foundation, plinth and under floors cement concrete with 20mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work ( if 20 mm metal is used in place of 40mm metal in item number 04.13 & 04.15)
(a) C.C. 1:2:4 (1cement, 2sand, 4metal) | 129 | 3920.69441860465 | 505769.58 |
5 | (c) CC 1:2:4 (1 cement, 2 sand, 4 graded stone aggregate 20mm nominal size) | 1.35 | 5310.81481481481 | 7169.6 |
6 | False work for R.C.C. and P.C.C. work in plinth and foundation. | 520.4 | 172.009185242121 | 89513.58 |
7 | (e) In Cement mortar 1:6 (1cement, 6sand) | 16.2 | 2865.6524691358 | 46423.57 |
8 | 22cm thick dry stone picked up boulder pitching i/c picking of boulder with individual size of 22cm depth. | 360 | 210.3495 | 75725.82 |
9 | (XXXI) 70 Km. Lead | 95.4 | 1001.11352201258 | 95506.23 |
10 | Benching the seat of embankment to an average depth of 15cm and cross slope of 1 in 12 including cleaning of all foreign material, vegetation and other growth like grass and plant roots and removing the rubbish up to a suitable distance and dressing etc. complete. | 337.5 | 163.567496296296 | 55204.03 |
11 | Site clearance, cutting grass, raking into heaps and removing off the premises | 3000 | 2.66691333333333 | 8000.74 |
12 | a (iii) Loose or soft soil for Tank Work | 4860 | 100.975670781893 | 490741.76 |
13 | (a) Loose or soft soil | 117.6 | 90.8073129251701 | 10678.94 |