State: MADHYA PRADESH District: NARSINGHPUR Block: BABAI CHICHLI Panchayat: IMALIYA (P)
Work Code: 1734004008/RC/22012034468596 (सी सी नाली रोड निर्माण पुष्पा राजपुत के घर से रोशन साहू के घर की ओर एवं रामशंकर कौरव के घर से आधार र)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2019-2020 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2019 Work start date : 1/8/2019
Present status : Earthern road Proposed Status : Constr of Cement Concrete Roads for Comm
Tech Sanction Details
Technical Sanction No. : 395 IM Sanction Date : 23/7/2019
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost 14th Fianance Commission scheme2 scheme3 Total
115600 0 0 0 521800 0 0 522000 0 637400
Financial Sanction Details
Financial\Administrative Sanction No: 01 IM Financial\Administrative Sanction Date 25/7/2019
Fin. Sanc. Amt. (in Rs) NREGA:115600 14th Fianance Commission
521800
Scheme 2
0
Scheme 3
0
Total
638000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Site clearance, cutting grass, raking into heaps and removing off the premises619.42.431505.142
2Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete.88.021220.29107409.9258
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)48.93127.2152920.08
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)62.963870.3243674.088
5False work for R.C.C. and P.C.C. work in plinth and foundation152.13161.6524591.8145
6Transportation of metal 295.271.2521033
7Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms.99.5771.9976813.005
8Earth work in excavation in trenches for foundations and for pipes,cables etc.not exceeding 1.5 m in width and for shafts,cesspits and the like not exceeding 10 sqm on plan including dressing of sides and ramming of bottoms lift upto 1.5m including gettin-Loose or soft soil9.78135.271322.9406
9Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Loose or soft soil.586.812.87511.04
10Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 20metres and upto 1.5metre.-Dense or hard soil.1618618
Total Activity 638000
S.NoMaterialQuantityUnit PriceTotal
1Convergence Amount1005218521800
Total Material 522000