State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: KADHURA
Work Code: 1702001047/WC/22012034544872 (नवीन तालाब निर्माण -पुराने खाद के पास , कदोरा)
Work Category: Water Conservation
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2020-2021 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 1/4/2020 Work start date : 1/5/2020
Present status : Non-existent Proposed Status : Constr of Earthen contour Bund for Community
Tech Sanction Details
Technical Sanction No. : 1702001/2020-2021/71731/TS Sanction Date : 2/5/2020
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
589960.08 403078.77 1987.45 42512.34 0 0 0 448000 0 1037538.64
Financial Sanction Details
Financial\Administrative Sanction No: 1702001/2020-2021/71731/AS Financial\Administrative Sanction Date 2/5/2020
Fin. Sanc. Amt. (in Rs) NREGA:1037539 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
1038000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Jungle clearance including uprooting of rank vegetation, grass, brush wood, saplings and tree not exceeding 30cm girth and removing not exceeding 50meters outside the periphery of the area cleared.30006.5419466666666719625.84
2(II) 3.00 m to 4.50 m472517.180797.5
3(b) C.C. 1:3:6 (1cement, 3sand, 6metal)104.063159.21689409956328748.11
4Centering and shuttering including strutting , propping etc. and removal of form work for P.C.C. work in foundation, footing, bases for column114.8156.78101045296217998.46
5False work for R.C.C. and P.C.C. work in plinth and foundation.113.4164.45052910052918648.69
622cm thick dry stone picked up boulder pitching i/c picking of boulder with individual size of 22cm depth.525202.213504761905106162.09
7(a) Other then black trap Basalt or granite105297.11828571428631197.42
8(a) Loose or soft soil472589.3957608465608422394.97
9(b) Dense or hard soil81.93146.02758452337411964.04
Total Activity 1038000
S.NoMaterialQuantityUnit PriceTotal
10002-Hire charges of Concrete Mixer 0.25 to 0.40 cum with Hopper10.40558859208.8675
20367-Portland Cement22.89215511126158.3631
30983-Fine sand (zone IV)48.90591076.2552634.974875
47753-Boulder 50 mm to 200 mm157.514723152.5
5MR6001-Stone Aggregate(single size): 40 mm nominal size other than BT67.635852535508.795
6MR6034-Blaster (Semi-Skilled)1.05329345.45
7MR6035-Gelatine (80%)19.9565.61308.72
8MR6036-Electric detonator10516.41722
9MR6037-Fuse coil (10m long)31.58.2258.3
10MR6038-Drilling of holes 25mm dia 0.75m deep78.7561.514843.9125
11MR6082-Stone Aggregate (Metal) 20mm nominal size (BT Metal) (Rate at quarry)24.973268217031.7224
12MR6091-WOOD-Kail wood 2nd class0.835315825.613219.12368
Total Material 286000