State: MADHYA PRADESH District: KHANDWA Block: CHHAIGAON MAKHAN Panchayat: ROSHIYA
Work Code: 1725006041/IF/20 (कपिलधारा सह मेढ बंधान निर्माण कार्य बोखार गोविंद ()
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2011-2012 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Perspective Plan :
Proposal Date : 1/4/2011 Work start date : 1/4/2011
Present status : Not Exist Proposed Status : Well
Tech Sanction Details
Technical Sanction No. : ro1097 Sanction Date : 1/4/2011
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
86000 45000 0 0 0 0 0 45000 0 131000
Financial Sanction Details
Financial\Administrative Sanction No: ro07 Financial\Administrative Sanction Date 1/4/2011
Fin. Sanc. Amt. (in Rs) NREGA:131000 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
131000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Loose or soft soil88.1390.097939.6317
2Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:1.5:3 (1cement, 1.5sand, 3graded stone aggregate 20 mm nominal size)5.092557.613018.184
3False work for R.C.C. and P.C.C. work in plinth and foundation102128.613117.2
4Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars14351.77393.1
5Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 11109511095
6Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Dense or hard soil22.6775.31707.051
7Earth work for well excavation including disposal of excavated soil lead upto 50m and lift upto 1.5m, disposed soil to be levelled and neatly dressed.-Hard Moorum22.67117.12654.657
8Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Disintegrated or soft rock (not requiring blasting)183226.3741425.71
9Earth work for well excavation including disposal or stacking of excavated soil lead upto 50m lift upto 1.5m-Hard rock requiring blasting.43.34393.317045.622
10work charge11560015600
Total Activity 131000
S.NoMaterialQuantityUnit PriceTotal
110 mm HG Chips120002000
220 M.M. METAL3.52761.52680.48
340 mm size HG metal125002500
4Blasting Holas139709730
5Board115001500
6BULLOCK CART164006400
7Cement1250250
8Cement(bori)253057625
9Centering and Shuttering5690.65073.6
10IRON SARIYA18060.310854
11Sand1.85565.261045.731
12Sand (Filling)115001500
13Transportation charges of material111
Total Material 51200