Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 27-Sep-2024 05:00:28 PM 
Back  
State: MADHYA PRADESH District: REWA Block: GANGEV Panchayat: PATAI
Work Code: 1713004007/RC/22012034196439 (पीसीसी सहनाली निर्माण शोभनाथ के घर से कुंवर बहादुर)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 14/4/2013 Work start date : 31/12/2013
Present status : No Road Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 07/1229 Sanction Date : 10/9/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
76000 51000 0 0 367000 0 0 418000 0 494000
Financial Sanction Details
Financial\Administrative Sanction No: 07/02 Financial\Administrative Sanction Date 15/9/2013
Fin. Sanc. Amt. (in Rs) NREGA:127000 Panchparmeshwar
367000
Scheme 2
0
Scheme 3
0
Total
494000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard115001500
2Filling foundation and around masonry work with moorum I/c ramming layers and watering.82.5145.411995.5
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)52.83234.3170771.04
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal)57.752343.8135354.45
5False work for R.C.C. and P.C.C. work in plinth and foundation67.2126.28480.64
6Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Lime Mortar 1: 2(1lime, 2sand)9.92179.321575.07
7Labour only for 10mm thick cement plaster of any ratio.6698.56501
8Stacking without boxing.-Puddle earth, moorum, sand or kankar82.5390.2632196.45
9Transportation of metal 51.97368.419145.748
10Transportation of 20 MM metal44.8368.416504.32
11Transportation rates for Bricks, kanker, stone chips shingle & excavated materials in disintegrated rock & soft rock.9.9710.47032.96
12Preparation of sub grade by excavating earth work to the 15cm average depth, dressing to camber including making good the undulations etc. and disposal of surplus earth with lead upto 50metres and upto 1.5metre.-Loose or soft soil52810.85702.4
13Korebandi for consolidation work.-30cm wide and 10cm thick.39.681.23215.52
14Providing and fixing laboratory sink with C.I. or M.S. brackets painted white including cutting holes in walls and making good the same but excluding fitting.-Vitreous China 450 mm x 300 mm x 150 mm size1290.31083.6
15transportion of sand51.95639.3633214.752
16contingency11372713727
17TRANSPOTATION OF CEMENT21.02259.565455.9512
Total Activity 494000
S.NoMaterialQuantityUnit PriceTotal
1Cement18526549025
2complite materail punch parmes1367000367000
3contangency and work charges110001000
Total Material 418000