Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Sep-2024 10:29:09 AM 
Back  
State: MADHYA PRADESH District: BHIND Block: ATER Panchayat: AITHAAR
Work Code: 1702001027/RC/22012034178080 (cc road bagel thok se karasdev ka munshii bagel ta)
Work Category: Rural Connectivity
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2013-2014 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : Yes Perspective Plan : Yes
Proposal Date : 15/4/2013 Work start date : 10/8/2013
Present status : Cement concrete Proposed Status : Cement Concrete
Tech Sanction Details
Technical Sanction No. : 97/1027 Sanction Date : 6/5/2013
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Panchparmeshwar scheme2 scheme3 Total
34800 23200 0 0 113000 0 0 137000 0 171000
Financial Sanction Details
Financial\Administrative Sanction No: 1027 Financial\Administrative Sanction Date 9/5/2013
Fin. Sanc. Amt. (in Rs) NREGA:58000 Panchparmeshwar
113000
Scheme 2
0
Scheme 3
0
Total
171000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1signboard116251625
2Dag-beling-Double spade "v" shaped stroke 100mm deep1950.478
3Filling in plinth with sand under floors including watering, ramming, consolidating and dressing complete.32.935456.415031.534
4Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)35.4152843.3100695.4695
5False work for R.C.C. and P.C.C. work in plinth and foundation55.455121.86754.419
6Providing and filling in position blown bitumen in expansion joints (10cm deep and 1cm Wide)115.76694.2
7Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 32.9355.2171.262
8Transportation charges of water for every additional 200m or part thereof, beyond initial lead of 200m up to 2 Km. Lead for 35.41529.21034.118
9Transportation of metal 30.106560.516874.413
10Transportation of sand11524815248
11Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work39.13573.42872.509
12contingency162486248
13Labour difference in case of old SoR133863386
Total Activity 171000
S.NoMaterialQuantityUnit PriceTotal
110 mm -  M.S. rod000
26 mm -  M.S. rod000
3CEMENT(BEGS)10023223200
4complite materail punch parmes1113000113000
Total Material 137000