S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | signboard | 1 | 2000 | 2000 |
2 | Contingency | 1 | 5285 | 5285 |
3 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 280 | 39 | 10920 |
4 | Transplanting plant and preparation of thala for 60x60x60cm. pits. Mandays per hundered | 20 | 157 | 3140 |
5 | Fencing with spick shrubes minimun 1.6m. height around the plant. | 280 | 66 | 18480 |
6 | Preperation of pits for plantation of poly plants including mixing of soil manure fertilizer and insecticides with first watering etc. complete. | 290 | 14.83 | 4300.7 |
7 | All maintainance of plants after transplanting work inclusive of Irrigation, Interculture operation, spray of pesticides, thala construction, earthing up etc.e with securty for first year per 675 plants. | 585.67 | 157 | 91950.19 |
8 | Supply of farm yard mannure (FYM) to the plantation site. | 280 | 10 | 2800 |
9 | Supply of singal super phosphate (SSP) | 140 | 6.6 | 924 |
10 | Supply of muriate of potash (MOP) | 70 | 17.8 | 1246 |
11 | Supply of urea. | 70 | 6 | 420 |
12 | Supply of Neem cake | 56 | 20 | 1120 |
13 | Supply of Themate, phorate 10 G pesticites | 7 | 59 | 413 |
14 | Supply of Plant protection pesticides per plant, a-foresty plant, b- fruit plant. | 310 | 32.65 | 10121.5 |
15 | Supply of farm yard mannure (FYM) and fartilizer second year per plant | 280 | 10 | 2800 |