S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | (a) Consolidation of Moorum /earth work (rate for 1Cum. of Moorum /earth work) | 2568.99 | 2.52450184702938 | 6485.42 |
2 | (j) 5.0 Km. Lead | 22.88 | 177.833916083916 | 4068.84 |
3 | (b) 1.0 Km. Lead | 542.19 | 113.52378317564 | 61551.46 |
4 | (d) 2.0 Km. Lead | 813.28 | 130.258004623254 | 105936.23 |
5 | (g) 3.5 Km. Lead | 1070.15 | 154.625538475915 | 165472.52 |
6 | (VI) 3.0 Km. Lead | 111.48 | 163.743541442411 | 18254.13 |
7 | (c) Metal 40 mm nominal size | 24.63 | 852.585058871295 | 20999.17 |
8 | (a) Boulders | 28.02 | 598.843326195575 | 16779.59 |
9 | For earthen dam - puddle filling of good clay ( excluding cost of puddle earth & Water) including mixing, kneading by tamping , ramming & laying etc. | 166.5 | 259.335015015015 | 43179.28 |
10 | Hearting, casing/cut off filling soil etc.
At optimum moisture content to achieve maximum dry density by mechanical sheep foot roller/ vibratory compacters including watering, required leads and lifts and material etc. complete. | 2568.99 | 21.9341647884966 | 56348.65 |
11 | Site clearance, cutting grass, raking into heaps and removing off the premises | 1828.67 | 2.81891210551931 | 5154.86 |
12 | a (iii) Loose or soft soil for Tank Work | 39.41 | 106.730778990104 | 4206.26 |
13 | b (iii) Dense or hard soil for Tank Work | 1172.29 | 144.074998507195 | 168897.68 |
14 | c (iii) Hard moorum for Tank Work | 1568.57 | 191.907903376961 | 301020.98 |
15 | a (i) Disintegrated or soft rock (not requiring blasting) for Tank Work | 216.66 | 609.846302963168 | 132129.3 |
16 | Collection of puddle earth including stacking at quarry | 166.5 | 194.558858858859 | 32394.05 |
17 | Collection of sand including screening, washing, stacking and all leads and lifts up to the loading point. | 22.88 | 241.124125874126 | 5516.92 |
18 | 22cm thick dry stone pitching ( without quarry spalls ) with individual stone of 22 cm depth and minimum size 0.014 cum | 111.48 | 379.205418012199 | 42273.82 |