S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20cm in depth consolidating each deposited layers by ramming and watering lead upto 50m and lift upto 1.5m | 34.5 | 58.5176811594203 | 2018.86 |
2 | (j) 5.0 Km. Lead | 13.5 | 174.888148148148 | 2360.99 |
3 | (XII) 7 Km. Lead | 6.75 | 228.845925925926 | 1544.71 |
4 | (XII) 7 Km. Lead | 6.75 | 179.096296296296 | 1208.9 |
5 | (a) 110 mm diameter OD RM 210.60 | 7 | 223.751428571429 | 1566.26 |
6 | b (iii) Dense or hard soil for Tank Work | 6.3 | 136.306349206349 | 858.73 |
7 | c (iii) Hard moorum for Tank Work | 18.9 | 181.559788359788 | 3431.48 |
8 | a (i) Disintegrated or soft rock (not requiring blasting) for Tank Work | 10.8 | 577.419444444444 | 6236.13 |
9 | Collection of boulders at source (maximum size 0.014cum) without quarrying i.e. picked up boulders. | 13.5 | 163.567407407407 | 2208.16 |
10 | Collection of River Borne Material (RBM) (any mixture of sand and graval ) i/c boxing and all leads and lifts up to loading point at quarry. | 13.5 | 185.376296296296 | 2502.58 |