Govt. of India
Ministry of Rural Development
Department of Rural Development
The Mahatma Gandhi National Rural Employment Guarantee Act 26-Sep-2024 11:34:20 PM 
Back  
State: MADHYA PRADESH District: GWALIOR Block: BHITARWAR Panchayat: SHYAMPUR(P)
Work Code: 1703004074/DP/22012034432296 (Pashu abrodhak deewal nirman Ambedkar park dhakadkhiriya)
Work Category: Drought Proofing
Note:
Total Material cost and Total Activity cost shown absolute value which is multiples of 100/1000!
Financial Year : 2018-2019 Execution Level : GP
Execution Agency : Gram Panchayat(3) Work Status : Approve
Included in Annual Plan : No Perspective Plan : No
Proposal Date : 14/4/2018 Work start date : 5/9/2018
Present status : Not Exist Proposed Status : Block Plantation of Forestry-in Fields-Community
Tech Sanction Details
Technical Sanction No. : 074/78 Sanction Date : 14/5/2018
Estimated Cost as per Tech. Detl (in Rs.)
Unskilled Material Contingency Total
Est. Material Cost Est. Skilled Cost Est. Semi-Skilled Cost Scheme1 scheme2 scheme3 Total
464533 204515 0 0 0 0 0 205000 0 669048
Financial Sanction Details
Financial\Administrative Sanction No: 074/004 Financial\Administrative Sanction Date 15/5/2018
Fin. Sanc. Amt. (in Rs) NREGA:669048 Scheme 1
0
Scheme 2
0
Scheme 3
0
Total
670000
S.NoActivity taken upon musterollQuantityUnit PriceTotal
1Dag-beling-Single spade stroke minimum 75mm deep6000.3180
2Filling foundation or under floor with 40mm gauge graded metal and moorum including ramming in layers and watering.33.7588229767.5
3Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:2:4 (1cement, 2sand, 4metal)23.633307.478153.862
4False work for R.C.C. and P.C.C. work in plinth and foundation90147.813302
5Random / uncoursed rubble masonry in plinth and foundation with mud mortar including levelling at plinth level.3151079339885
6Steel work welded in built up sections, framed work, including cutting hoisting fixing in position in gratings, frames, guard bars, ladders, railing, brackets and similar works & trusses and trussed purlins up to 25m span and 15 m over all height12559.17387.5
7Labour only for item no.1031, 1032 and 1033-Flush pointing141154.677040.6
8Pointing on random rubble masonry or uncoursed stone masonry with cement mortar 1:4 (1cement, 4sand)-Flush pointing96078.575360
9Collection of hard metal other then black trap basalt and granite for road works (without blasting) including stacking as per MOST 1995, clause 400.2.5-Grading-2 (Size ranging from 63 mm to 45 mm)66510.933719.4
10Lossening of hard soil by ploughing the existing gound13552.77114.5
11Lossening of hard soil by ploughing the existing goundSpreading, dressing , breaking of clods of ploudged earth upto 20 m, lead and lift upto 1.5 mt, disposed soil to be leveled and neatly dressed135537155
Total Activity 670000
S.NoMaterialQuantityUnit PriceTotal
120 M.M. METAL16267.74283.2
240 M.M. METAL20136.72734
3Boulder Transportation210191.3840189.8
4cement Begs9531029450
5contigency11748617486
6DOOR 112559.17387.5
7IRON GATE 2125607500
8Sand12.65259.833286.8495
9SIGNBOARD160006000
10Soil122.732.4
11Transportation Of Material31521166465
12उपजाऊ मि‍टटी परि‍वहन8.44123.031038.3732
13पत्‍थर90211.2519012.5
Total Material 205000