S.No | Activity taken upon musteroll | Quantity | Unit Price | Total |
1 | Site clearance, cutting grass, raking into heaps and removing off the premises | 4900 | 1.8 | 8820 |
2 | Contingency | 1 | 12411 | 12411 |
3 | Providing and laying in foundation, plinth and under floors cement concrete with 40mm nominal size graded stone aggregates (metal) i/c ramming in layers and curing complete excluding cost of form work-C.C. 1:3:6 (1cement, 3sand, 6metal) | 1.26 | 2451.8 | 3089.268 |
4 | Providing and placing in position RCC for roof, beams, columns column footing lintels chhajjas, balcony, stairs etc, excluding cost of reinforcement & centring but including finishing & curing.-CC 1:2:4 (1cement, 2sand, 4graded stone aggregate 20 mm nominal size) | 2.87 | 3399 | 9755.13 |
5 | False work for R.C.C. and P.C.C. work in plinth and foundation | 16.88 | 287.6 | 4854.688 |
6 | Class 25 open bhatta or pajawa burnt brick masonry in plinth and foundation.-Cement mortar 1:6 (1cement, 6sand) | 3.51 | 2486.7 | 8728.317 |
7 | Steel work in single section including in cutting, hoisting fixing in position in R.S. joists, channels, angles, tee. | 60 | 63.2 | 3792 |
8 | Providing and placing in position tested steel for R.C.C. work including cutting, bending, binding etc. as per drawings and placing in position complete up to floor two level including cost of binding wire and all wastage etc. complete.-Mild steel and Medium tensile steel bars | 225.3 | 55.2 | 12436.56 |
9 | 15mm thick cement plaster on rough side of wall in-Cement mortar 1:6 (1cement, 6sand) | 15.25 | 94.2 | 1436.55 |
10 | Add if Lead is more than 5.00Km-For every 0.5 Kms. Lead beyond 5 Kms. and part there of upto 10 Kms. | 572.85 | 186.57 | 106876.6245 |
11 | Labour only for moorum, kankar, shingle/ gravel/red bajri spreading levelling to gradient and required camber including dressing. | 572.85 | 38.5 | 22054.725 |
12 | Earth work in bulk excavation (exceeding 30cm in depth, 1.5m in width as well as 10sqm on plan) including disposal of excavated soil lead upto 20m and lift upto 1.5m, disposed soil to be levelled and neatly dressed -Dense or hard soil for Road Work | 396 | 87.4 | 34610.4 |
13 | Earth work in rough excavation,filling excavated earth into depressions on banking as directed ,top surface to be levelled and neatly dressed.-Hard moorum | 1214.19 | 96.4 | 117047.916 |
14 | Collection of hard moorum including stacking at quarry. | 572.85 | 140.7 | 80599.995 |
15 | SIGN BOARD | 1 | 3500 | 3500 |
16 | Labour difference in case of old SoR | 2415 | 21 | 50715 |